My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - M1988112
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1988112
>
_GENERAL DOCUMENTS - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 4:30:08 PM
Creation date
12/15/2011 5:04:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Monitoring Requirement Summary
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.7 Miscellaneous Monitoring <br /> Miscellaneous monitoring to be required for the San Luis <br /> Project includes monitoring required primarily for reclamation. <br /> Testing of the reclamation soils will be performed to determine any <br /> amendments that might be required. This testing will be performed <br /> at the time that the soils are to be used for reclamation. <br /> Other testing includes performing an EP toxicity test on any <br /> sludge present in the collection pond upon completion of operations. <br /> 3.0 Reporting ReQuirements <br /> z <br /> All monitoring data collected will be reviewed by a qualified <br /> individual . Data collected on the tailings disposal area will be reported <br /> to a professional engineer familiar with the design and operation of the <br /> facilities. This engineer will compare and evaluate the recorded monitoring <br /> against anticipated performance of the tailings disposal area. When <br /> i <br /> A significant variation from anticipated performance is detected, the <br /> engineer will notify the design engineer who will establish whether <br /> i modifications to the design or remedial measures are required. The data <br /> collected as part of the tailings monitoring program will be compiled in <br /> to <br /> ■! an annual report for submittal to the MLRD. Any significa varia__on which <br />` could affect tailings operation. or stability will be reported to the MLRD <br /> J as soon as the data is obtained and BMR will work with the MLRD to obtain <br /> approval for any rest ed modification to the approved plan. <br /> Surface and groundwater monitoring results will <br /> _ <br /> b <br /> evaluated as part of the project's annual report. As part of the pled and <br />� permit BMR committed to monitoringapproved <br /> heap leach facility on a monthly basis andsubmittingells adjacent to the <br /> h <br /> became available. This program will be applied to h tailings lint as they <br /> facility and the groundwater wells in the vicinityof t gs d Posal <br /> area will be monitored monthly with the results reported,monthlygs . <br /> I <br /> al <br />�I n <br /> n addition, any significnat changes ln <br /> reported to the MLRD as soon as these results Dare available.1 results will be <br /> 71 01 327 <br />
The URL can be used to link to this page
Your browser does not support the video tag.