Laserfiche WebLink
Pit inflows will be monitored and evaluated also as a part of the <br /> annual report. In addition, as discussed in the approved permit, these <br /> inflow results will be submitted to the Division on a quarterly basis. <br /> In the event of a spill , the Emergency Response Plan requires that <br /> BMR notify the MLRD as soon as possible. Details for spill monitoring and <br /> reporting will be determined with the MLRD on a case by case basis. <br /> Results of the soils testing and the EP toxicity testing will be <br /> submitted to the Division as soon as the results are available. <br /> Table 1 presents a summary of all monitoring required for the San <br /> Luis Project. <br /> 1 <br /> L <br /> 71 b1 328 <br />