My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - M1988112
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1988112
>
_GENERAL DOCUMENTS - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2020 4:30:08 PM
Creation date
12/15/2011 5:04:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Monitoring Requirement Summary
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' a laboratory for analyses of the parameters listed in Table G.1-2 <br /> of the approved permit. <br /> Two single stage sediment samplers are located at each station <br /> to measure sediment flow. These results are analyzed as frequently <br /> as necessary based on storm flows. <br /> An extensive analysis of the monitoring results will be <br /> performed annually. Less extensive analyses will be performed more <br /> frequently. The surface water program will be re-evaluated annually <br /> t to ensure that the monitoring program and sampling frequency are <br /> adequate. <br /> 1 <br /> 2.5 Pit Inflows <br /> The south wall of the West Pit will experience some seepage <br /> toward and into the pit from the Rito Seco through the surface <br /> alluvium, if exposed during the mining operations, and to a lesser <br /> 4 <br /> extent the Santa Fe Conglomerate. The extent of the surface alluvium <br /> along the south wall cannot be determined until mining exposes this <br /> area. As discussed in the approved permit, during mining operations <br /> the seepage into the pit through the Santa Fe Conglomerate will be <br /> monitored for quantity to verify the groundwater conditions and the <br /> expected post-mining conditions. <br /> I 2.6 Spill Response Monitoring <br /> Spill response monitoring is detailed in the San Luis Project <br /> Emergency Response Plan. The spill response monitoring for the San <br /> Luis Project will be determined on a case by case basis in accordance <br /> with the guidelines established in the approved Emergency Response <br /> Plan. <br />°i <br />-I 71 01 326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.