Laserfiche WebLink
' a laboratory for analyses of the parameters listed in Table G.1-2 <br /> of the approved permit. <br /> Two single stage sediment samplers are located at each station <br /> to measure sediment flow. These results are analyzed as frequently <br /> as necessary based on storm flows. <br /> An extensive analysis of the monitoring results will be <br /> performed annually. Less extensive analyses will be performed more <br /> frequently. The surface water program will be re-evaluated annually <br /> t to ensure that the monitoring program and sampling frequency are <br /> adequate. <br /> 1 <br /> 2.5 Pit Inflows <br /> The south wall of the West Pit will experience some seepage <br /> toward and into the pit from the Rito Seco through the surface <br /> alluvium, if exposed during the mining operations, and to a lesser <br /> 4 <br /> extent the Santa Fe Conglomerate. The extent of the surface alluvium <br /> along the south wall cannot be determined until mining exposes this <br /> area. As discussed in the approved permit, during mining operations <br /> the seepage into the pit through the Santa Fe Conglomerate will be <br /> monitored for quantity to verify the groundwater conditions and the <br /> expected post-mining conditions. <br /> I 2.6 Spill Response Monitoring <br /> Spill response monitoring is detailed in the San Luis Project <br /> Emergency Response Plan. The spill response monitoring for the San <br /> Luis Project will be determined on a case by case basis in accordance <br /> with the guidelines established in the approved Emergency Response <br /> Plan. <br />°i <br />-I 71 01 326 <br />