Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />37,502 <br />539,855 <br />Total <br />37,502 <br />539,855 <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />) igh Volume Solutio6i Collection System <br />I1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 5A and Figure 5B, advancing in front of the placement. CPeP was placed and <br />sandbagged in accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />areas shown on Figure 5A and Figure 5B. The DCF was hauled from the processing area to the <br />placement area using 40 -ton articulating haul trucks. The DCF was placed in a 2 -foot lift using <br />various CAT dozers except where haul routes were established. Haul route consisted of five - <br />foot lifts to be spread into 2 -foot lifts later. Laborers were present at all times during placement <br />holding the high volume collection piping in place, removing debris /sandbags, and assisting <br />the dozer operator with lift thickness. All DCF was placed on previously approved primary <br />geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />E) Leak Detection Trench <br />1) VLF <br />Construction of the 10,060' bench leak detection manhole was performed near station A0 +00 <br />( + / -), adjacent to the 9,910 bench manhole. The excavation was performed using a CAT 312 <br />excavator and the subgrade was prepared using a jumping jack compactor. A 36" diameter <br />HDPE SDR 21 pipe with a welded HDPE bottom was place in the excavation. The 3" solid <br />HDPE pipe was placed through the inlet of the sump. The leak detection manhole was <br />backfilled with soil liner fill using a CAT 312 excavator and a jumping jack compactor. Leak <br />detection manhole construction was observed and inspected by an AMEC field representative <br />and found to be constructed in accordance with design drawing and project specifications. <br />HI) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a CAT dozer. <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF resumed performing deployment, seaming, <br />and repair /QC activities. Geomembrane installation was performed in the area shown on <br />Figure 3. Approximately 373, 889 square feet of 80mil LLDPE was deployed using a Komatsu <br />VLF Weekly Report WE 10.22.2011 <br />