My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
11/18/2011 7:07:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/17/2011
Doc Name
Weeklt Construction Quality Assurance ("CQA") Reports: Weeks of 10/16/2011 & 10/23/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
TC1
BMK
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />VLF EART WORKS F Il LD MONITORING SUMMARY (WEEKLY REPO T <br />Project Title: CC &VI Phase 5 <br />Ow i er: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 22, 2011 <br />Reporting Period: 10/16/11 through 10/22/11 <br />Ambient Temperature Range (F): Low: 23 °F to 40 °F ( + / -) High: 47 °F to 61 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: Snow removal was continued during the week. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade acceptance was not performed during the week. Previous subgrade acceptance is <br />shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />No work performed during the week. <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />C) Soil Liner Fill <br />1) VLF <br />Previous soil liner fill (SLF) placement is shown on Figures 2. Moisture conditioning of SLF <br />material was performed in place using a tandem -axle water truck and compaction was achieved <br />using a 10 -ton vibratory smooth drum compactor. Nuclear density testing, moisture <br />verification, and depth check testing was performed with results within project specifications. <br />Test locations were surveyed by Ames. <br />VLF Weekly Report WE 10.22.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.