Laserfiche WebLink
crossing. Also, include copies of any agreements the Operator has with the owner(s) <br />of the oil /gas facilities. <br />The line does not cross over any tanks. The centerline of the conveyor is shown <br />offset to the west from the tank by apx. 14± feet. Agreements accommodating the <br />conveyor line have been made with Kerr -McGee Gathering LLC of 20 October 2011 <br />and Anadarko Petroleum Corporation (a.k.a., Kerr -McGee Oil and Gas Onshore L.P.) <br />as signed 5 May 2009 by Garrett C. Varra. Copies of the agreements are included <br />with this submittal. The reference to `overhead' simply means the conveyor is <br />supported above ground. <br />6.4.12 Exhibit L - Reclamation Costs <br />7. The Applicant has provided a cost estimate for dismantling the portion of the <br />conveyor within the amended area of the Heintzelman site. Please note that the <br />original financial warranty estimate for the Heintzelman site did not included a cost <br />for dismantling the proposed conveyor system. Therefore, the Applicant will need to <br />revise the cost estimate to include dismantling the entire length of the conveyor <br />system within the Heintzelman site. <br />Since the Heintzelman Project is extracted in phases, raw product will be loaded into <br />the conveyor system beginning north of Station Line Three in Tract A, or an <br />additional 1,100± feet of line within the planned route. As other Tracts are opened, <br />the operator will provide per unit fund increases to the warranty at that time. The <br />per unit cost of the line based upon the prior estimates from Divide Constructors is <br />$5.03± per linear foot of line when you subtract apx. 105± feet for the bridge span <br />from the total line length in the Amendment Area of 1,413± feet and the Kurtz <br />Project Area of 3,101± feet based upon the Divide Constructor Cost of $22,200.00 <br />for dismantling the length of that portion of the line. When the per unit cost is <br />applied to the estimated 1,100 ±for the initial line within the existing Heintzelman <br />permit area, or an additional $5,539.92. The estimated total length of line required <br />for all Tracts within the original Heintzelman Project Area is 3,550± feet of line, or <br />an additional 2,450± feet once Tract A is completed or new Tracts are opened. <br />8. The Applicant has proposed including the cost to remove the conveyor system <br />within the Kurtz site (M- 1999 -006) under the financial warranty for the Heintzelman <br />site. The Division is unable to include the reclamation costs associated with the <br />Kurtz site under the financial warranty for the Heintzelman site. The cost to reclaim <br />Varra Companies, Inc. <br />M- 2009 -018 3 <br />Heintzelman Conveyor Amendment Correspondence of Friday 4 November 2011 <br />