Laserfiche WebLink
the conveyor system will have to be divided between the sites. The Division will <br />send notice of the financial warranty increase for the Kurtz site under separate <br />cover. • <br />The operator can accommodate this consideration. <br />9. Please provide the Division with the total volume of concrete which will need to be <br />used to construct the concrete pads and other foundations. <br />Divide Constructor Cost estimates include the costs for demolition or removal of <br />concrete bases on the line and the bridge. The total volume of concrete necessary <br />to construct the pads and foundations is 35.0± cu.yds. <br />6.4.13 Exhibit M - Other Permits and Licenses <br />10.On Page 4 of the application form, the Applicant has stated the conveyor system will <br />cross Weld County Road 28 under an approved Weld County Right of Way permit. <br />However, the Applicant has stated under Exhibit M that the Weld County Right of <br />Way permit is currently pending. Please clarify if the Weld County Right of Way <br />permit is pending or if it has been approved and commit to providing the Division <br />with a copy of this permit prior to constructing the conveyor system. <br />The Right -of -Way permit is pending approval. The applicant will provide a copy of <br />the approval to the OMLR upon receipt and prior to on -set of construction. <br />6.4.14 Exhibit N - Source of Legal Right to Enter <br />11. The Amendment Application states that Varra Companies has recently acquired <br />properties to the east of the original permit boundary for the Heintzelman site. <br />Please provide a legal right of entry for this property as required by Construction <br />Materials Rule 6.4.14. This may be a copy of an access lease, deed, abstract of title, <br />or a current tax receipt. <br />M- 2009 -018 <br />Varra Companies, Inc. <br />Heintzelman Conveyor Amendment Correspondence of Friday 4 November 2011 <br />4 <br />