My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-17_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-07-17_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:45 PM
Creation date
11/3/2011 4:16:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/17/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />Permit or other job action : TR -120 <br />Task description Haul topsoil from RPEE soil storage areas to RPEE <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />11 iimmanf rlccnrinfinn <br />Truck/loader team -Truck: <br />-Loader <br />Generic 8 -10 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area : <br />-Dump area :NA <br />NA <br />LCY <br />Road maintenance -Motor grader: <br />-Water truck :Water <br />NA <br />Tanker, 2,500 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />NA <br />misctruk <br />% Utilization-machine: <br />100 <br />82 <br />NA <br />NA <br />NA <br />100 <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$10.10 <br />$22.39 <br />NA <br />NA <br />NA <br />$8.32 <br />Operating cost/hour : <br />$31.23 <br />$20.11 <br />NA <br />NA <br />NA <br />$13.89 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />NA <br />NA <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$63.61 <br />$81.04 <br />NA <br />NA <br />NA <br />$60.90 <br />4 <br />1 <br />0 <br />0 <br />0 <br />1 <br />Group subtotals : <br />Work : $335.49 <br />Support : $0.00 <br />Maintenance: $60.90 <br />Total work team cost/hour: WJV0.JV <br />. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 64,533 LCY factor : NA volume: 64,533 LCY <br />Source of quantity take -off : acres X 2 ft thick <br />Source of estimated swell factor: NA <br />Material purchase cost: $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weiqht) Basis: Truck Bed (volume) Basis: <br />Material weight: <br />2,900 pounds /LCY <br />7,100 <br />Source <br />(Cat HS) <br />Struck volume : <br />8.00 <br />LCY <br />Descr.: Decomposed rock - 50% Rock, 50% E arth <br />0.830 <br />Heaped volume: <br />10.00 <br />LCY <br />Rated payload : <br />27,280 pounds <br />Average volume: <br />9.00 <br />LCY <br />Payload capacity : <br />9.40 LCY <br />Adjusted volume *: <br />9.40 <br />LCY <br />Final truck volume based on number <br />of loader passes : <br />7.15 <br />LCY <br />"truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: Job Condition Corre ctions: <br />Rated capacity (nom. heaped) : 3.250 LCY Truck <br />Descr.:Other - rock/dirt mixtures (100 -120%) Altitude adj.: 1.000 <br />Site altitude ft): <br />Loader <br />1.000 <br />7,100 <br />Source <br />(Cat HS) <br />Bucket fill factor: <br />Adjusted bucket capacity : <br />1.100 <br />3.575 LCY <br />Job efficiency: <br />Net correction : <br />0.830 <br />0.830 <br />(1 shift/day) <br />0.830 <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.