My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-17_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-07-17_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:45 PM
Creation date
11/3/2011 4:16:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/17/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # : 20C State : Colorado Permit/job # C -80 -007 <br />Date <br />User <br />26- Apr -2010 <br />County : Gunnison <br />Filename :C007 -20C <br />TAK Site West Elk Mine <br />Agency or organization name: CDRMS <br />Permit or other job action : TR -120 <br />T ask d escription: Compact remaining waste rock hauled to RPEE from prep. p l a nt <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 825G Series /1 (2005) Horsepower: 339 <br />Compactor type : Soil - tamping foot Shift basis : 1 per day <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Loose Shrinkage <br />volume : 10,000 LCY <br />$54.43 <br />$102.73 <br />$38.54 <br />$195.70 <br />Utilization % Data source : (CRG) <br />NA <br />100 <br />NA <br />Total fleet cost/hour : $ 195.70 <br />Compacted <br />factor : 0.750 volume: 7,500 CCY <br />Source of estimated volume: Sec. 7, Exh. 82, assumed 10,000 cyds =670 2 -ft lifts <br />Source of estimated shrinkage factor DRMS estimate <br />HOURLY PRODUCTION <br />Unadiusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) : <br />8.67 <br />feet <br />Average compactor speed (S) : <br />5.00 <br />mph <br />Compacted thickness of each lift (L) : <br />24.00 <br />inches <br />Conversion constant (C) : <br />16.3 <br />(5,280 ft./12 in. /27 cu.ft.) <br />Required number of machine passes (P) : <br />2 <br />passes <br />Unadjusted hourly unit production : <br />8,479.26 <br />CCY /hr <br />Job Condition Correction Factors <br />Site altitude : 7,100 feet <br />Source <br />Altitude adjustment factor : <br />1.00 <br />(Cat HB) <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Net job correction : <br />0.83 multiplier <br />Adjusted hourly unit production <br />7,037.79 CCY /hr <br />Adjusted hourly fleet production : 7,037.79 CCY /hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time: 1.07 hours <br />Abbreviation :none <br />Unit cost $0.028 per CCY Total job cost: $209 <br />
The URL can be used to link to this page
Your browser does not support the video tag.