Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />r <br />PROJECT IDENTIFICATION <br />Task # : 20B State : Colorado Permit/job# : C -80 -007 <br />Date : 0412612010 <br />User: TA <br />County : Gunnison <br />Site West Elk Mine <br />Agency or organization name CDRMS <br />Permit or other job action : TR -120 <br />Task description : Grade i <br />HOURLY EQUIPMENT COST <br />coal waste rock into <24 "lifts <br />Basic machine: Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 2.00 % () <br />Average site altitude : 7,100 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.79 <br />1.00 <br />0.46 <br />Data source : <br />(CRG) <br />(1shift1da) <br />(fnd -rf) <br />Utilization % <br />(Cat HB) <br />(Cat HB) <br />Cost Breakdown : Ownership cost/hour : <br />$67.84 <br />NA <br />Operating cost/hour : <br />$119.93 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$226.31 Total fleet <br />cost/hour : <br />$905.25 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume: 10,000 LCY factor : <br />NA volume : <br />10,000 <br />LCY <br />Source of estimated volume : Assumed 100,000 cyds of remaining waste <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 100 feet <br />Material consistency : <br />1.20 <br />(Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 2.00 % () <br />Average site altitude : 7,100 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.79 <br />1.00 <br />0.46 <br />(gen.) <br />(avg.) <br />(1shift1da) <br />(fnd -rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production : 571.04 LCY /hr <br />Adjusted fleet production : 2,284.17 LCY /hr <br />Abbreviation : none <br />Filename :C007 -208 <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time: 4.38 Hours <br />Unit cost: $0.396 /LCY Total job cost: $3,963 <br />