Truck/Loader Team Work cont'd Task #: 20E sheet 2 of 2 <br />Loading Tool Cycle Time:, Number of loading tool passes required to fill truck : 2 _ passes <br />Excavators and front shovels - machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: <br />- cycle time elements (min.) : Load <br />NA Maneuver: NA Dump <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and dumF 0.525 <br />0.100 <br />minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material : <br />Mixed material <br />0.020 <br />(Cat HB) <br />Stockpile : <br />Conveyor or dozer piled 10 ft. high or less <br />0.010 <br />(Cat HB) <br />Truck ownership <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Operation : <br />Constant operation <br />-0.040 <br />(Cat HB) <br />Dump target : <br />Nominal target <br />0.000 <br />(Cat HB) <br />Road <br />segment # <br />Net cycle time adjustment: <br />-0.050 <br />minutes <br />Total <br />resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) : <br />0.475 <br />minutes <br />2, 600 <br />Net load time per truck * : <br />0.575 <br />minutes <br />Truck Cycle Time: <br />*bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />trucks <br />Truck exchange time * *: <br />0.50 minutes........ Adjusted for site altitude : <br />0.500 <br />minutes <br />Truck load time: <br />0.575 minutes........ Adjusted for site altitude : <br />0.575 <br />minutes <br />Truck maneuver and dump time: <br />0.80 minutes........ Adjusted for site altitude : <br />0.800 <br />minutes <br />— set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1 st loader cycle) <br />LCY /hr <br />JOB TIME AND COST <br />Truck travel (haul & return) time: <br />Road condition : Rutted dirt, little maintenance, no <br />water, 2" tire penetration <br />Haul route : <br />Fleet size : <br />1 <br />Team(s) Total job time: <br />Road <br />segment # <br />Haul distance <br />(feet) <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />(feet/minute) <br />Travel time <br />(minutes) <br />1 <br />2, 600 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />2.448 <br />trucks <br />Adjusted hourly truck team production : <br />272.02 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />272.02 <br />LCY /hr <br />Adjusted <br />hourly multiple truck/loader team production : <br />272.02 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 <br />Team(s) Total job time: <br />237.24 <br />Hours <br />Unit cost: <br />$1.457 <br />/LCY Total job cost: <br />$94,040 <br /><i <br />Return route : <br />Haul time ** : 2.448 minutes <br />minutes <br />minutes <br />Loading tool unit production : <br />399.07 <br />LCY /hour...... Adjusted for job efficiency : <br />331.23 <br />LCY /hour <br />Truck unit production : <br />81.93 <br />LCY /hour...... Adjusted for job efficiency: <br />68.00 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />5 <br />trucks........... Selected no. trucks /loader : <br />4 <br />trucks <br />Adjusted hourly truck team production : <br />272.02 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />272.02 <br />LCY /hr <br />Adjusted <br />hourly multiple truck/loader team production : <br />272.02 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 <br />Team(s) Total job time: <br />237.24 <br />Hours <br />Unit cost: <br />$1.457 <br />/LCY Total job cost: <br />$94,040 <br /><i <br />travel time shown for each segment includes acceleration /deceleration adjustment Return time * *: 0.913 <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 5.236 <br />