Laserfiche WebLink
U <br />• <br />Probable Hydrologic Consequences New Elk Mine <br />230 Test? <br />225 <br />200 <br />III <br />g 150 <br />g 135 <br />DD <br />u <br />50 <br />C 3s <br />is D <br />D 2n a0 bD e0 ', <br />Elapsed Time (minutes) <br />B -10 <br />2. Test 7 <br />190 <br />a 180 <br />I]D <br />s <br />w 160 <br />LY <br />� 150 <br />C <br />a <br />140 <br />0.12 013 0" 0.15 016 <br />_ <br />A <br />Test <br />ilow(gpm) <br />230 <br />200 <br />Test <br />225 <br />2. <br />190 <br />1]5 <br />a 130 <br />8 leD <br />Im <br />W nD <br />IW <br />a. <br />]3 <br />I60 <br />50 <br />25 <br />1sD <br />3 0 <br />0 <br />0 1D 20 30 a0 sD 60 <br />"0 <br />ElulweO Time(minutn) <br />s 6 7 e 9 10 u 12 <br />Flow(gpm) <br />335 <br />3D0 <br />1]5 <br />ISO <br />123 <br />t 100 <br />]3 <br />� 30 <br />33 <br />G�r 0 <br />D <br />^ 300 <br />190 <br />Is0 <br />� I]0 <br />160 <br />O <br />ID 1 e0 ISD <br />Elnlb nl Iinif (minutes) D x e 0 8 10 12 <br />Figure B - 1. Plots of Packer Test Response In Borehole NE -5.10 (Continued) <br />• <br />• • <br />4164A.110130 WhehrOUe At 0ruttcs6 <br />PR 02 Exhibit 8(4) Page 170 Revised 1/31/11 <br />