Laserfiche WebLink
• <br />• <br />• <br />Probable Hydrologic Consequences New Elk Mine 9.11 <br />250 <br />225 <br />2ao <br />175 <br />a <br />ISO <br />} 125 <br />F 100 <br />i <br />� 75 <br />9 so <br />25 <br />a e <br />0 <br />250 <br />225 <br />NO <br />171 <br />$ 1to <br />F 12s <br />100 <br />6 <br />e 71 <br />SO <br />2s <br />a 0 <br />0 <br />5 l0 Is 20 25 30 ]s <br />Elupeed Time(minoees) <br />1]0 Teat 10 <br />120 <br />uo <br />II <br />80 <br />a <br />70 <br />I] 1] 17 19 21 23 35 27 <br />Flow(gpm) <br />185 <br />180 <br />a175 <br />170 <br />y 165 <br />Test 11 <br />1 1� <br />L 1W <br />k Iss <br />a <br />10 20 30 a0 50 00 150 <br />ElapsedTime(minutes) 00 02 04 Oa os <br />Figure B - 2. Plots of Packer Test Response in Borehole NE -5.10 (Continued) <br />4164A. 110130 Whehtnne Arroriater a <br />PR 02 Exhibit 8(4) Page 171 Revised 1/31/11 <br />• <br />17J <br />17J <br />