Laserfiche WebLink
• <br />• <br />Probable Hydrologic Consequences New Elk Mine <br />250 Test <br />335 <br />200 <br />115 <br />It 150 <br />125 <br />s" 'to <br />P 15 <br />so <br />25 <br />a 0 <br />0 5 10 1s 20 25 30 <br />FL sal T4n.Ln1..4..\ <br />B -9 <br />00 TeA4 <br />IW <br />ig 190 <br />y 110 <br />s <br />e 160 <br />b <br />fi 1w <br />I50 <br />as 41 41 49 49 <br />250 TeR 5 <br />231 <br />zoo <br />p 115 <br />g I50 <br />p 125 <br />sIor <br />a 15 <br />a 50 <br />t2s <br />E o <br />0 5 15 <br />Eapsed Timelminutes) <br />250 Test 240 Test <br />335 0 / <br />NO <br />0 220 <br />115 — <br />21 <br />g 150 � E10 <br />125 :00 <br />} 100 190 / <br />i 15 i 100 <br />m <br />170 <br />e 35 � <br />a 0 I <o <br />0 to 21, s0 ISO <br />Elapsed Time(mioutes) s 10 15 20 <br />FlOW mPm) <br />Figure B - 2. P lots of Packer Test Response in Borehole NE -5-10 (Continued) <br />0 <br />4164A.110130 Whetstone Araoeiarer4 <br />PR 02 Exhibit 8(4) Page 169 Revised 1/31/11 <br />