Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 38A Page 3 of 3 <br />uuua awuw. <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.986 <br />2 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.841 <br />3 <br />4224.00 <br />0.00 <br />2.00 <br />2.00 <br />2868 <br />1.473 <br />Haul Time: 5.300 minutes <br />Seg #aa 1`vMHaul <br />Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />4224.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />1.489 <br />2 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />2905 <br />1.818 <br />3 <br />5280.00 <br />0.00 <br />2.00 <br />2.00 <br />29 05 <br />1.818 <br />Loading Tool unit <br />Production 470.20 <br />Truck Unit Production <br />76.63 <br />Optimal No. of Trucks: 6 <br />Return Time: 5.125 <br />Total Truck Cycle Time: 13.530 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: _ <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 381.62 <br />Adjusted single truck/loader team production: 381.62 <br />Adjusted multiple truck/loader team production: 381.62 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $2.062 /LCY <br />minutes <br />minutes <br />390.27 LCY/Hour <br />63.60 LCY/Hour <br />6 Truck(s) <br />LCY/Hour <br />_ LCY /Hour <br />LCY/Hour <br />Total job time: 23.86 Hours <br />Total job cost: $18,780.73 <br />CIRCES Cost Estimating Software <br />