My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_PERMIT FILE - C1981028A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2011-09-07_PERMIT FILE - C1981028A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
11/2/2011 3:21:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
9/7/2011
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip 4.2 miles access road <br />Site: Keenesburg Strip Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 039 State: Colorado <br />Date: 8/17/2011 County: Weld <br />User: JHB <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -039 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />12 acres Rip Depth (ft): 1.50 Volume: 29,524 BCY or CCY <br />Source of estimated quantity: Permit boundary map <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet/second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$57.16 <br />Average Ripping Length: <br />NA <br />Operating Cost/Hour: <br />$117.89 <br />88.00 <br />100 <br />Ripper Operating Cost/Hour: <br />$8.38 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />Job Condition Correction Factors <br />NA <br />Total Unit Cost/Hour: <br />$221.92 <br />0.891 <br />Total Fleet Cost/Hour: <br />$221.92 <br />4,000 <br />MATERIAL QUANTITIES <br />Selected estimating <br />method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />12 acres Rip Depth (ft): 1.50 Volume: 29,524 BCY or CCY <br />Source of estimated quantity: Permit boundary map <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA feet/second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />500.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.891 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.891 <br />Acres/hr <br />Site Altitude: <br />4,000 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.74 <br />Acres /hr <br />Adjusted Hourly Fleet Production: <br />0.74 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />16.51 <br />Unit cost: $300.246 Per acre <br />Total job cost: $3,663.00 <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.