Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 38A Page 2 of 3 <br />Truck Bed (volume) Basis: <br />Struck Volume: 12.00 LCY <br />Heaped Volume: 18.00 LCY <br />Average Volume: 15.00 LCY <br />Adjusted Volume: 17.96 LCY <br />Final Truck Volume Based on Number of Loader Passes: 17.28 LCY <br />Loading Tool Cayacity <br />Bucket Size Class: NA <br />Rated Capacity: 4.800 LCY (heaped) <br />Bucket Fill Factor: 0.900 Other - cemented materials 85 - 95 %) 0.900 <br />Adjusted Capacity: 4.320 LCY <br />Job Condition Corrections: Site Altitude (ft.): 4000 feet <br />Net Correction: 1 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />4 <br />passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Material: <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 1 0.830 1 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />4 <br />passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle l'une Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.040 minutes <br />0.535 minutes <br />1.705 minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.705 Minutes Adjusted for site altitude: 1.705 Minutes <br />Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />CIRCES Cost Estimating Software <br />