Laserfiche WebLink
rayc 1 01 c <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Site <br />Site: Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job #: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 29- Apr -11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Abbreviation: None <br />Filename: C059 -011 <br />COSTShift basis: 1 per day <br />- Scraper: <br />- Dozer: <br />Cat 621G <br />NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />NA <br />NA <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />I NA <br />Cost Breakdown: Scraner Work Team Runnnrt Fnuinment Maintenance Fmiinment <br />Total work team cost/hour: $162.91 <br />MATERIAL QUANTITIES <br />Initial volume: 5,243 CCY Swell factor: 1.125 <br />Loose volume: 5,898 LCY <br />Source of estimated volume: Map 5; Page 2.05 -5R <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$46.12 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$91.84 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$162.91 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$162.91 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $162.91 <br />MATERIAL QUANTITIES <br />Initial volume: 5,243 CCY Swell factor: 1.125 <br />Loose volume: 5,898 LCY <br />Source of estimated volume: Map 5; Page 2.05 -5R <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs /LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />48,000 pounds <br />Payload Capacity: <br />18.82 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.82 <br />LCY <br />CIRCES Cost Estimating Software <br />