Laserfiche WebLink
tsunaozer w orrsneet t onr a i aslt iF u iu rage z of t <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />AVG. <br />0.900 <br />CAT HB)) <br />1.000 <br />(GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3952 <br />Adjusted unit production: 692.71 LCY /hr <br />Adjusted fleet production: 692.71 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: 50.287 /LCY <br />Total job time: 3.53 Hours <br />Total job cost: $701.41 <br />CIRCES Cost Estimating Software <br />