Laserfiche WebLink
rage t or Z <br />BULLDOZER WORK <br />Task description: Backfill Sediment and Dugout Ponds <br />Site: Terror Creek Loadout Permit Action: 2011 Midterm Review Pertnit/Job #: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 010 <br />Date: 29- Apr -11 <br />User: JRS <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9R - 9SU (2005) <br />Horsepower: <br />405 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C059 -010 <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost /Hour: <br />$49.19 <br />NA <br />Operating Cost/Hour: <br />$110.89 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $198.57 <br />Total Fleet Cost/Hour: $198.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />2,175 <br />Swell factor: <br />1.125 <br />Loose volume: <br />2,447 LCY <br />Source of estimated volume: Map 7 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1.752.8 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />5.800 feet <br />2,6501bs/LCY <br />Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />