My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_PERMIT FILE - C1983059 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-08-29_PERMIT FILE - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:44 PM
Creation date
11/2/2011 9:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
8/29/2011
Doc Name
Bond Calculations Exhibit 10
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Terror Creek Loadout <br />MOTOR GRADER WORK <br />Finish Grade Entire Site <br />PROJECT IDENTIFICATI011 <br />Task #: 009 <br />Date: 29- Apr -11 <br />User: JRS <br />Permit Action: 2011 Midterm Review <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: <br />Cost Breakdown: <br />Permit/Job #: C1983059 <br />Abbreviation: None <br />Filename: C059 -009 <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $112.13 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.50 acres <br />Source of estimated acreage: Map 5 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.25 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$34.52 <br />Selected Blade Angle: <br />NA <br />Operating Cost/Hour: <br />$53.14 <br />12:10 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />feet <br />Net grading or ripping width per pass: <br />Operator Cost/Hour: <br />$24.47 <br />Unadjusted Hourly Unit Production: <br />NA <br />Total Unit Cost/Hour: <br />$112.13 <br />Total Fleet Cost/Hour: $112.13 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.50 acres <br />Source of estimated acreage: Map 5 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.25 <br />mph <br />Selected Application: <br />Finish <br />grading (0 -2.5 mph) - 1.25 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12:10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.5303 <br />acres /hour <br />Job Condition Correction Factors <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $81.41 per acre <br />Site Altitude: 5800 feet <br />1.3773 <br />1.3773 <br />Total job time: <br />Total job cost: <br />acres/Hour <br />acres /Hour <br />3.27 Hours <br />$366.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.