My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_PERMIT FILE - C1983059 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-08-29_PERMIT FILE - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:44 PM
Creation date
11/2/2011 9:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
8/29/2011
Doc Name
Bond Calculations Exhibit 10
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 011 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.90 Minutes <br />0.70 Minutes <br />Site Altitude: 5800 feet <br />Net Correction: I 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB <br />Site Altitude: 5800 feet <br />Net Correction: I 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />%) <br />Roll. Res <br />%) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />500.00 <br />2.00 <br />4.00 <br />6.00 <br />1204 <br />0.49 <br />Haul Time: 0.49 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />%) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />500.00 <br />-2.00 <br />4.00 <br />2.00 <br />2898 <br />0.34 <br />Return Time: <br />0.34 <br />minutes <br />Total Scraper team cycle time: <br />2.43 <br />minutes <br />Adjusted for job conditions: <br />385.77 <br />LCY/Hour <br />Selected Number of Scrapers: <br />1 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />385.77 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />385.77 <br />LCY/Hour <br />Unadjusted unit production/hour: 464.78 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 15.29 Hours <br />Unit cost: $0.422 /LCY Total job cost: $2,490.90 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.