Laserfiche WebLink
<br /> <br /> <br />Table lA <br />P.ECLAMATION TIMETABLE <br />Activity <br />Removal and Salvage of the Structures <br />and Facilities <br />Grading and Scarification of the Area <br />Install Interim Drainage Control Plan <br />Topsoil Replacement <br />Revegetation <br />Removal of all Drainage Control Structures <br />Time <br />30 days <br />14 days <br />7 days <br />5 days <br />7 days <br />Contingent on <br />Revegetation Success <br />2.05-7Ra <br />