Laserfiche WebLink
• Use of facilities <br />Reclamation <br />• Removal and Salvage of the facilities <br />• Grading and scarification of the area <br />• Install interim drainage control plan <br />• Topsoil Replacement <br />• Revegetation of the affected land for use as an irrigated pasture <br />• Removal of diversion structures and sedimentation pond <br />revegetation <br />following successful <br />Such practices will result in land use capabilities equal to or greater than those presently <br />found. The estimated cost of reclamation is shown in Exhibit 10, Bond Calculation. A <br />reclamation timetable is provided on Table lA, Reclamation Time Table. <br />The anticipated final surface configuration of the loadout facilities area is shown on the Post- <br />Disturbance Topography Map, (Map 10). <br />Loadout Facilities <br />At the conclusion of the loadout operations, all installed coal handling facilities will be <br />removed and sold as used equipment or scrap. Ali unsold equipment, facility debris, <br />concrete, etc. will be buried onsite. The burial location is shown on Map 10. No equipment <br />will be merely abandoned by TCC. <br />The only structures which will remain after reclamation at the Terror Creek site, will be the <br />same structures that were present prior to the area being affected by the loadout facility. The <br />siding tract, which is on railroad property, will be removed unless it is sold to the Railroad. <br />The structures will be the following: <br />M~-ad <br />(,2/v -o Y~ <br />~ ~PRo~ED Io~zt/o3 <br />2.05.7R <br />Rev. 6/25!03 <br />