My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARRANTY RECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 - DEMOLITION <br /> Projected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facili, Designation Dimensions Material Volume/Size ! Actual Cost <br /> 24 ITRANSPORT GARAGE -SUPERSTRUCTURE 100'L X 50'W X 25'H STEEL 125000 CU.FT. 0.13 $ 16,250 <br /> 11 -FLOOR(10"T w/wire mesh) 100'L X 50'W CONCRETE 5000 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 100'+100'+50'+50' CONCRETE 300 LIN.FT. <br /> 25 TELEPHONE BUILDING -SUPERSTRUCTURE 301 X 18'W X ITH BRICK 6480 CU.FT. 0.13 $ 842 <br /> -FLOOR(6"T plain) 301 X 18'W CONCRETE 540 SQ.FT. <br /> -FOOTING(1.07 X 2.0'W) 30'+30'+18'+18' CONCRETE 96 LIN.FT. <br /> i <br /> VM6 C-1600 TRANS STRUCT- SUPERSTRUCTURE 271 X 32'W X 40'H STEEL 34560 CU.FT. 0.13 $ 4,493 <br /> " -FLOOR(10"T w/rebar) 271 X 32'W CONCRETE 864 SQ.FT. <br /> " -FOOTING(1.57 X 2.0'W) 27'+27'+32'+32' CONCRETE I18•I-I <br /> " -ASBESTOS REMOVAL NA ASBESTOS 1 ESTIM E' <br /> r <br /> 27 C-1500 TRANS STRUCT-SUPERSTRUCTURE 341 X 27'W X 40'H STEEL 36720 CU.FT. 0.13 $ 4,774 <br /> " -FLOOR(10"T w/rebar) 34'L X 27'W CONCRETE 918 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 34'+34'+27'+27' CONCRETE 122 LIN.FT. <br /> " -ASBESTOS REMOVAL NA ASBESTOS r1 ESTIMATE P//?a «fir <br /> Vf8 REGRIND BUILDING -SUPERSTRUCTURE 180%X 50'W X 40'H STEEL 10$0000 CU.FT. 0.13 $ 140,400 <br /> 11 " -FLOOR(12"T w/rebar) 180'L X 50'W CONCRETE 27000 SQ.FT. <br /> " of -FOO --(24-T-X,3.0'W) 180'+180'+50'+50' CONCRETE 460 LINTT. <br /> IGH CONCRETI� ASSUME 12"TX3456 S CONCRETE 3456 SQ.FT. <br /> 29 TAILING DIST HOUSE? -SUPERSTRUCTURE 61'L X 40'W X 14'H STEEL 34160 CU.FT. 0.13 $ 4,441 <br /> " -FLOOR(10"T w/rebar) 61'L X 40'W CONCRETE 2440 SQ.FT. <br /> -FOOTING(1.5'T X 2.0'W) 61'+61'+40'+40' CONCRETE 202 LIN.FT. <br /> 1/30 LIME-SODIUM SIL',ICATE-SUPERSTRUCTURE 25'L X 165'W X 50'H STEEL 206250 CU.FT. 0.13 $ 26,813 <br /> " -FLOOR(8"T w/rebar) 25'L X 165'W CONCRETE 4125 SQ.FT. <br /> " -FOOTING(1.0'T X 2.0'W) 25'+25'+165'+165' ICONCRETE 380 LIN.FT. <br /> i <br /> C7 <br /> 6 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.