My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARR6AECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 - DEMOLITION <br /> Proected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facility Designation Dimensions Material Volume/Size Actual Cost <br /> 31 MILL TANK VALVE HSE1-SUPERSTRUCTURE 21'L X 29'W X 10'H TIN 6090 CU.FT. 0.13 $ 792 <br /> FLOOR(8"T w/wire mesh) 21'L X 29'W CONCRETE 609 SQ.FT. <br /> FOOTING(1.07 X 2.0'W) 21'+21'+29+29' CONCRETE 100 LINYT. <br /> 32 MILL TANK VALVE HSE2-SUPERSTRUCTURE 201 X 20'W X 10'14 TIN 4000 CUYT. 0.13 $ 520 <br /> FLOOR(8"T w/wire mesh) 20-L X 2 'W CONCRETE 400 SQ.FT. <br /> FOOTING(1.07 X 2.0'W) 20'+20'+20'.+20' CONCRETE 80 LINYT. <br /> i <br /> 03 ORE BIN -SUPERSTRUCTURE 90%X 90'W X 32'H STEEL 259200 CU.FT. 0.13 $ 33,696 <br /> " -FLOOR(8"T plain) 901 X 90'W CONCRETE 8100 SQ.FT. <br /> -FOOTING(1.07 X 2.0'W) 90'+90'+90'+90' CONCRETE 360 LINYT. <br /> 34 REAGENT STORAGE BLDG-SUPERSTRUCTURE 71'L X 13'W X ITH STEEL 11999 CUYT. 0.13 $ 1,560 <br /> "-FLOOR(8"T w/rebar) 71'L X 13'W CONCRETE 923 SQ.FT. <br /> "-FOOTING(1.57 X 2.0'W) 71'+71'+13'+13' CONCRETE 168 LINYT. <br /> „75 NO 2 CRUSHER DUCON -SUPERSTRUCTURE 911 X 39'W X 30'H STEEL 106470 CUYT. 0.13 $ 13,841 <br /> FLOOR(12"T w/rebar) 91'L X 39'W CONCRETE 3549 SQ.FT. <br /> FOOTING(2.0'T X 3.0'W) 91'+91'+39'+39' CONCRETE 260..I I-N.F_T_ <br /> ASBESTOS REMOVAL NA ASBESTOS 1rLIN.FT. <br /> AjV <br /> ef36 TRANSPORT FUEL TANKS-SUPERSTRUCTURE 38'L X 10'W X 5'H STEEL 1900 0.13 $ 247 <br /> -FLOOR(8"T plain) 38'L X 10'W CONCRETE 380 <br /> FOOTING(1.0'T X 2.0'W) 38'+38'+10'+10' CONCRETE 96 <br /> 7 C-1300 TRANS STRUCT-SUPERSTRUCTURE 421 X 25'W X 2TH STEEL 28350 CUYT. 0.13 $ 3,686 <br /> " -FLOOR(10"T w/rebar) 421 X 25'W CONCRETE 1050 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 42'+42'+25'+25' CONCRETE 134 LIN1--T-. <br /> -ASBESTOS REMOVAL NA ASBESTOS 1 ESTIM,6,T 67 <br /> �,4 8 6 CRUSHER SECONDARY-SUPERSTRUCTURE 160'L X 90'W X 8TH STEEL 1252800 CUTT. 0.13 $ 162,864 <br /> " -FLOOR(12"T w/rebar) 160'L X 90'W CONCRETE 14400 SQ.FT. <br /> -FOOTING(2.07 X 3.0'W) 1 160'+160'+90'+90' CONCRETE 500 LIN.FT. <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 I'RED R.BANTA,INC. 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.