My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_HYDROLOGY - M1977493
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977493
>
1999-02-05_HYDROLOGY - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:27:50 PM
Creation date
11/1/2011 7:29:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
HYDROLOGY
Doc Date
2/5/1999
Doc Name
Water Treatment Facility Area
From
Climax
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WARRfECLAMATION COST ESTIMATE <br /> 5.1 TASK 4 - DEMOLITION <br /> Projected Climax <br /> Unit Costs Estimated/ <br /> Bldg.# Facility Designation Dimensions Material Volume/Size Actual Cost <br /> t'17 2 CRUSHER SWTCH HSE-SUPERSTRUCTURE 861 X 32'W X 18'H STEEL 49536 CU.FT. 0.13 $ 6,440 <br /> FLOOR(8"T w/rebar) 861 X 32'W CONCRETE 2752 SQ.FT. <br /> FOOTING(1.57 X 2.0'W) 86'+86'+32'+32' CONCRETE 236 LINYT. <br /> /18 PRECON -SUPERSTRUCTURE 821 X 82'W X 48'H STEEL 322752 CU.FT. 0.13 $ 41,958 <br /> " -FLOOR(10"T w/rebar) 821 X 82'W CONCRETE 6724 SQ.FT. <br /> -FOOTING(15T X 2.0'W) 82'+82'+82'+82' CONCRETE 328 IN.F-T. <br /> -ASBESTOS REMOVAL NA ASBESTOS 1 ESTIMATE, ��Vk-7C y 50, 0,19 <br /> 09 DRYING PLANT -SUPERSTRUCTURE 155'L X 105'W X 30'H STEEL 488250 CU.FT. 0.13 $ 63,473 <br /> -FLOOR(10"T w/rebar) 155'L X 105'W CONCRETE 16275 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 155'+155'+105'+105' CONCRETE 520..L-INI F-f. <br /> " -ASBESTOS REMOVAL NA ASBESTOS tl- 1 ESTIMATES r.1&16 64 <br /> Vf 20 PACKING PLANT -SUPERSTRUCTURE 210'L X 80'W X 30'H STEEL 504000 CU.FT. 0.13 $ 65,520 <br /> " -FLOOR(10"T w/rebar) 210'L X 80'W CONCRETE 16800 SQ.FT. <br /> -FOOTING(1.57 X 2.0'W) 210'+210'+80'+80' CONCRETE 580 LINYT. <br /> 21 NO 1 THICKNER -SUPERSTRUCTURE 11 I'L X 11 FW X 10'H STEEL 123210 CU.FT. 0.13 $ 16,017 <br /> " " " -FLOOR(8"T plain) I I I'L X I I I'W CONCRETE 12321 SQ.FT. <br /> FOOTING(1.07 X 2.0'W) 111'+111'+111'+111' CONCRETE 444 LINYT. <br /> 22 NO 2 THICKNER -SUPERSTRUCTURE I I I'L X 11 FW X 10'H STEEL 12,3210 CU.FT. 0.13 $ 16,017 <br /> FLOOR(8"T plain) I I I'L X I I PW CONCRETE 12321 SQ.FT. <br /> FOOTING(1.07 X 2.0'W) 111'+111'+111'+111' CONCRETE 444 LINYT. <br /> 3 13 MILL BUILDING -SUPERSTRUCTURE 725'L X 180'W X 80'H STEEL 104,40000 CU.FT. 0.13 $ 1,357,200 <br /> " -FLOOR(12"T w/rebar) 7251 X 180'W CONCRETE 130500 SQ.FT <br /> " -F—WINsi . ' N 'W) 725'+725'+180'+180' CONCRETE 1810 LINYT. <br /> " {c-HIGH CONCRETEA ASSUME 12"TX36315 S CONCRETE 36315 SQ.FT. <br /> COO <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.