Laserfiche WebLink
CLIMAX MINE FINANCIAL WRECLAMATION COST ESTIMATE <br /> 4.3 MINE/MILL COMPLEX <br /> PLAN SURFACE DISTURBANCE(ACRES)= N/A <br /> ��i�, ;,.a �,. .: �PREP �� L. �-:'\,. _ 'R� ,.._._.... � •' <br /> t <br /> TASKS: <br /> Regrade Mine/Mill Complex area. <br /> Finish grade Mine/Mill Complex area. <br /> Haul and spread topsoil in Mine/Mill Complex. <br /> Regrad" Finish le Haul/Spread Topsoil '('y TOTAL COSTS <br /> Grade �1 <br /> Equipment D9N 14G 773B 988B D7G 14G Water <br /> Dozer Grader Haul Truck Loader Dozer Grader Truck <br /> Time Required(hours) 813.54 172.44 715.02 238.34 238.34 238.34 238.34 ----- <br /> Area Reclaimed(acres) ------ ------ ------ <br /> ------ ------ ------ ------ ------ <br /> Unit Cost <br /> $637 6$ 1924$69O 1 39.84 87Equipment($/hour) <br /> ( ) $11560 $23 30 $22 76 ' ` $22 22' $23 12 $23 30 +$21 55, <br /> Labor $/hour <br /> Other Cost '�53a µ w <br /> Ic(Z !lals�oS �,SL f(b3.r 33,y <br /> Subtotal Equipment Cost $518,752.51 $11,734.54 $85,258.98 $21,553.09 $15,110.76 $9,495.47 $2,829.10 $664,734.44 <br /> Subtotal Labor Cost $94,044.99 $4,017.85 $16,273.86 $5,295.91 $5,510.42 $5,553.32 $5,136.23 $135,832.58 <br /> Subtotal Other Cost ------ ------ ------ ------ ------ $0.00 <br /> $800,567.02 <br /> TOTAL TASK COST $612,797 $15,752 $101,533 $26,849 $20,621 $15,049 $7,965 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT 1 $172,017 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 61 <br />