My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_GENERAL DOCUMENTS - M1977493 (8)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1999-02-05_GENERAL DOCUMENTS - M1977493 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:14:33 PM
Creation date
11/1/2011 7:29:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/5/1999
Doc Name
Open Pit
From
Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL WRECLAMATION COST ESTIMATE <br /> 4.3 MINE/MILL COMPLEX <br /> PLAN SURFACE DISTURBANCE(ACRES)= N/A <br /> ��i�, ;,.a �,. .: �PREP �� L. �-:'\,. _ 'R� ,.._._.... � •' <br /> t <br /> TASKS: <br /> Regrade Mine/Mill Complex area. <br /> Finish grade Mine/Mill Complex area. <br /> Haul and spread topsoil in Mine/Mill Complex. <br /> Regrad" Finish le Haul/Spread Topsoil '('y TOTAL COSTS <br /> Grade �1 <br /> Equipment D9N 14G 773B 988B D7G 14G Water <br /> Dozer Grader Haul Truck Loader Dozer Grader Truck <br /> Time Required(hours) 813.54 172.44 715.02 238.34 238.34 238.34 238.34 ----- <br /> Area Reclaimed(acres) ------ ------ ------ <br /> ------ ------ ------ ------ ------ <br /> Unit Cost <br /> $637 6$ 1924$69O 1 39.84 87Equipment($/hour) <br /> ( ) $11560 $23 30 $22 76 ' ` $22 22' $23 12 $23 30 +$21 55, <br /> Labor $/hour <br /> Other Cost '�53a µ w <br /> Ic(Z !lals�oS �,SL f(b3.r 33,y <br /> Subtotal Equipment Cost $518,752.51 $11,734.54 $85,258.98 $21,553.09 $15,110.76 $9,495.47 $2,829.10 $664,734.44 <br /> Subtotal Labor Cost $94,044.99 $4,017.85 $16,273.86 $5,295.91 $5,510.42 $5,553.32 $5,136.23 $135,832.58 <br /> Subtotal Other Cost ------ ------ ------ ------ ------ $0.00 <br /> $800,567.02 <br /> TOTAL TASK COST $612,797 $15,752 $101,533 $26,849 $20,621 $15,049 $7,965 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT 1 $172,017 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.