My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-02-05_GENERAL DOCUMENTS - M1977493 (8)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977493
>
1999-02-05_GENERAL DOCUMENTS - M1977493 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 4:14:33 PM
Creation date
11/1/2011 7:29:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
2/5/1999
Doc Name
Open Pit
From
Climax
To
DMG
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MINE FINANCIAL W "RECLAMATION COST ESTIMATE <br /> 4.4 E DUMP (Includes F DUMP) <br /> PLAN.SURFACE DISTURBANCE (ACRES) = 171 <br /> o <br /> TASKS: <br /> Grade west side of E Dump. <br /> P <br /> Grade cast side of E Dump. <br /> Grade northeast finger of E Dump. <br /> Haul and spread topsoil on top of E Dump. <br /> Spread topsoil on top of E Dump. <br /> Grade Grade Grade Haul/Spread Spread TOTAL COSTS <br /> West Side East Side NortheasPq Topsoil �� Topsoilf2, <br /> Equipment D9N D9N D9N 773B 988B D7H <br /> Dozer Dozer Dozer Haul Truck Loader —Dozer <br /> Time Required(hours) 1447.04 347.90 1222.21 57.34 19.11 21.27 ------ <br /> Area Reclaimed(acres) ------ ------ ------ ------ ------ ------ ------ <br /> Unit Cost <br /> Equipment($/hour) $236 52, $236 52 �$354 78 $lI4 IS $90 43 62'$76 <br /> Labor($/hour) o l� f )$46 24� .. .. $46 24 ,f nu <br /> 69 36 $22 76 $22 22 $23`12 ' � ---- <br /> Other Cost ------ ------ ------ <br /> �n2 ya4,1'� $t3ro.91 Ila.fo5 a�, f <br /> Subtotal Equipment Cost $342,253.90 $82,284.13 $433,615.66 $6,545.36 $1,728.12 $1,629.71 $868,056.88 <br /> Subtotal Labor Cost $66,911.13 $16,086.66 $84,772.49 $1,305.06 $424.62 $491.76 $169,991.73 <br /> Subtotal Other Cost ------ ------ ------ ------ ------ ------ $0.00 <br /> $1,038,048.60 <br /> TOTAL TASK COST $409,165 $98,371 $518,388 $7,850 $2,153 $2,121 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT $10,003 <br /> )— :1 <br /> � yl31i��- �'SZ311q2, $1Oi33`f �j�9 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.