Laserfiche WebLink
CLIMAX MINE FINANCIAL W "RECLAMATION COST ESTIMATE <br /> 4.4 E DUMP (Includes F DUMP) <br /> PLAN.SURFACE DISTURBANCE (ACRES) = 171 <br /> o <br /> TASKS: <br /> Grade west side of E Dump. <br /> P <br /> Grade cast side of E Dump. <br /> Grade northeast finger of E Dump. <br /> Haul and spread topsoil on top of E Dump. <br /> Spread topsoil on top of E Dump. <br /> Grade Grade Grade Haul/Spread Spread TOTAL COSTS <br /> West Side East Side NortheasPq Topsoil �� Topsoilf2, <br /> Equipment D9N D9N D9N 773B 988B D7H <br /> Dozer Dozer Dozer Haul Truck Loader —Dozer <br /> Time Required(hours) 1447.04 347.90 1222.21 57.34 19.11 21.27 ------ <br /> Area Reclaimed(acres) ------ ------ ------ ------ ------ ------ ------ <br /> Unit Cost <br /> Equipment($/hour) $236 52, $236 52 �$354 78 $lI4 IS $90 43 62'$76 <br /> Labor($/hour) o l� f )$46 24� .. .. $46 24 ,f nu <br /> 69 36 $22 76 $22 22 $23`12 ' � ---- <br /> Other Cost ------ ------ ------ <br /> �n2 ya4,1'� $t3ro.91 Ila.fo5 a�, f <br /> Subtotal Equipment Cost $342,253.90 $82,284.13 $433,615.66 $6,545.36 $1,728.12 $1,629.71 $868,056.88 <br /> Subtotal Labor Cost $66,911.13 $16,086.66 $84,772.49 $1,305.06 $424.62 $491.76 $169,991.73 <br /> Subtotal Other Cost ------ ------ ------ ------ ------ ------ $0.00 <br /> $1,038,048.60 <br /> TOTAL TASK COST $409,165 $98,371 $518,388 $7,850 $2,153 $2,121 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT $10,003 <br /> )— :1 <br /> � yl31i��- �'SZ311q2, $1Oi33`f �j�9 <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 62 <br />