Laserfiche WebLink
CLIMAX MINE FINANCIAL WARRWCLAMATION COST ESTIMATE <br /> v <br /> 4.2 OPEN PIT <br /> PLAN SURFACE DISTURBANCE (ACRES) = N/A <br /> O g po o� <br /> alm <br /> TASKS: <br /> Grade west open pit periphery. <br /> Haul and spread topsoil at west open pit perimeter. <br /> Grade. 5 Haul/Spread Topsoil TOTAL COSTS <br /> Periphery <br /> Equipment D9N 773B 988B D7G 14G Water <br /> Dozer Haul Truck Loader Dozer Grader Truck <br /> Time Required(hours) 270.93 163.26 54.42 54.42 54.42 54.42 ------ <br /> Area Reclaimed(acres) ------ ------ ------ ------ ------ ------ ------ <br /> Unit Cost <br /> Equipment $/hour $127 53 $114 15 �3$9p 43 $63 40 $39 63 <br /> Labor($/hour) ) $23 12 •, _.•,.... $22 76 $22 22 $23 12 $312 �$21 55 ------ <br /> ,. <br /> Other Cost ------ ------ -- - <br /> ------ ------ ------ <br /> �OD - p3ujq I 'Fitz, �B�,Sa �,is f Z53.g <br /> Subtotal Equipment Cost $34,551.70 $18,636.13 $4,921.20 $3,450.23 $2,156.66 $645.97 $64,361.89 <br /> Subtotal Labor Cost $6,263.90 $3,715.80 $1,209.21 $1,258.19 $1,258.19 $1,172.75 $14,878.04 <br /> Subtotal Other Cost ------ ------ ------ ------ ------ ------ $0.00 <br /> $79,239.93 <br /> TOTAL TASK COST $40,816 $22,352 $6,130 $4,708 $3,415 $1,819 <br /> TOTAL TASK COST-MULTIPLE EQUIPMENT $38,424 a <br /> �Q <br /> Golder Associates Inc. 983-2460 <br /> 2/5/99 FRED R.BANTA,INC. 60 <br />