Laserfiche WebLink
the southeast % of Section 19, approximately 4,100 feet, terminating at the proposed <br /> facility in the northwest % of Section 20. This proposed alignment is approximately 4 <br /> miles long. <br /> An alternate route being considered would proceed from the County Road 91 and <br /> Yellow Creek crossing northerly 5,200 feet along the existing BLM waterline, thence <br /> northeasterly 2,000 feet to the proposed facility. <br /> The pipeline will be located in the existing rights-of-way of County Road 24 and the <br /> proposed plant access road. The alternate gas line route would require an easement <br /> to cross the BLM and Marathon Oil lands. <br /> • communications cable — Telephone and other communications service will be <br /> provided to the phase one experimental pilot plant facilities. The proposed <br /> communications cable will tie-in to the existing communications cable right-of-way of <br /> County Road 24 on the west % corner of Section 29; thence northwesterly, in <br /> Section 30 approximately 2,800 feet, thence northeasterly through the southeast '/4 <br /> of Section 19, approximately 4,100 feet, terminating at the proposed facility in the <br /> northwest % of Section 20. This proposed alignment is approximately 1.4 miles long <br /> and is located within the proposed plant access road right-of-way in Township 1 <br /> South, Range 98 West in Rio Blanco County. Alternatively, the communications <br /> cable may be buried along the alternate natural gas pipeline route. <br /> • power line — The proposed power line routing description is based on an alignment <br /> provided by the White River Electric Association, Inc. and lies entirely in Township 1 <br /> South, Range 98 West in Rio Blanco County. The power line right-of-way will be <br /> obtained from BLM by White River Electric. <br /> The proposed centerline of the overhead power service to the Lease area begins at <br /> a tie-in to the existing 25 kv distribution line located at the approximate center of the <br /> southwest % of Section 25; thence northwesterly, approximately 4,300 feet, to the <br /> southern line of Section 23; thence, approximately 11,300 feet, west along the south <br /> line of Sections 23, 22 and 21; thence northwesterly, approximately 3,000 feet, to the <br /> center line of Section 21; thence west, approximately 7,000 feet, along the centerline <br /> of Sections 21 and 20 to the west line of Section 20 and the Lease area. This <br /> proposed centerline alignment is approximately 4.8 miles long. <br /> G:\LM\M78545.002\Reclamation\Reclamexh.DOC D-7 <br />