Laserfiche WebLink
county: RIOBLANCO <br />labor zone: 2 1 shifts / day: $ <br />EQUIPMENT DESCRIPTIONS: <br />scraper team: <br />CAT 615C with ROPS cab <br />road maintenance: <br />motor grader: <br />NA <br />water truck: <br />NA <br />COST DATA: <br />SCRAPER <br />scraper <br />TEAM <br />dozer(s) <br />ROAD MAINTENANCE <br />grader <br />water truck <br />file name: <br />615C -ROP <br />NA <br />NA <br />utilization: <br />10.0 <br />NA <br />NA <br />NA <br />cost / hour: ownership: <br />$24.15 <br />N/A <br />NA <br />NA <br />operating: <br />354.26 <br />N/A <br />NA <br />NA <br />operator: <br />523.13 <br />N/A <br />NA <br />NA <br />unit subtotals: <br />I $101.55 <br />1 N/A <br />I NA <br />1 NA <br />team subtotals: <br />5101.55 <br />1 NA <br />TOTAL WORK TEAM CO4 $101.55 <br />ATE RIALQUANTITI <br />beginning volume: 16133 BCY <br />material swell factor: 1_429 <br />cubic yard volume: 16.133 BCY <br />final volume: 23.047 LCY <br />source of volume figure: 20 acre at 6" depth <br />source of swell factor: Spreadsheet_ table ._fppso(_ <br />OU LYaPROD ...',..... �.� . .: ._. .., .. ' <br />SCRAPER CYCLE TIME: <br />scraper loading time (min.): <br />0_9 <br />JOB CONDITION CORRECTION <br />site altitude (ft.): <br />FACTORS: <br />6500 <br />maneuver & spreading time (min.): <br />0 7 <br />altitude adjustment: <br />1.00 <br />travel time' <br />haul route: <br />road <br />seg. no. <br />(haul & return): <br />length <br />(ft.) <br />grade <br />res. ( %) <br />rolling <br />res. ( %) <br />job efficiency factor: <br />0.83 <br />net job correction factor: <br />0.83 <br />total <br />res. ( %) <br />velocity <br />(fpm) <br />travel time <br />(minutes) <br />1 <br />675 <br />0.00 <br />7.50 <br />7.50 <br />804 <br />0.99 <br />return route: <br />1 <br />675 <br />0.00 <br />7.50 <br />7.50 <br />haul time: <br />1449 <br />0.99 <br />0.73 <br />*1st & last seg. adj. for acceleration/deceleration return time: <br />total cycle time: <br />0.73 <br />3.32 <br />MACHINE PAYLOAD: <br />mat. weight (Ibs/Icy): 1 2900.00 <br />MACHINE VOLUME: <br />struck capacity (Icy): <br />N/A <br />mat desc.: Deccm Qsl1 rc?yk_ O .S Rcck�SQ'o Egrtfl <br />heaped capacity (Icy): <br />16.00 <br />rated payload (Ibs): <br />38,400 <br />average capacity (Icy): <br />16.00 <br />payload volume (Icy): <br />13.24 <br />adjusted volume (Icy): <br />13.24 <br />_ <br />UNADJUSTED HOURLY PRODUCTION PER SCRAPER OR PUSH -PULL PAIR (LCY /HR): <br />238.95 <br />ADJUSTED (job condition corrections) HOURLY UNIT PRODUCTION (LCY /HR): <br />198.33 <br />ADJUSTED HOURLY FLEET PRODUCTION (LCY/hr): <br />198.33 <br />56' 00 <br />FLEET SIZE: <br />1 scraper(s) <br />JOB TIME (hours): <br />116.21 <br />UNIT COST /LCY: <br />$0.512 <br />'TOTAL <br />TOTAL JOB COST: <br />511,801 <br />task no.: 13 <br />prep. by: ACS <br />permit no.: .11 - 99 - 051 <br />date: 07/01/99 <br />file name: M051 -13 <br />mine name: Rock School Proleot <br />.. Lease <br />permit action: Newappl /C4tion <br />task description: Repfac...e._topSoff on evaporation_ and ws er storaae pOrd area. <br />Colorado Division of Minerals and Geolo <br />jiTIMATING FORM - SCRAPER W <br />TASK IDENTIFICATION <br />HOURLY EOUIPMENT <br />