Laserfiche WebLink
task no.: 14 <br />prep. by: ACS <br />permit no.: <br />M -99 -051 <br />date: 07/01/99 <br />file name: M051 -14 <br />mine name: <br />Rock Sc hr o Le Ise Project <br />permit action: New applic ation <br />task description: Replace topsoil in 4roCeS..prant area <br />T <br />,HOURLY EQU IPMENT CO <br />county: R/0BLANCO <br />labor zone: 2 <br />shifts / day: S <br />EQUIPMENT DESCRIPTIONS: <br />scraper team: <br />road maintenance: motor grader: <br />water truck: <br />COST DATA: <br />file name: <br />utilization: <br />cost / hour: ownership: <br />operating: <br />operator: <br />CAT 615C with BOPS cab <br />NA <br />NA <br />SCRAPER TEAM <br />scraper dozer(s) <br />615C -ROP <br />100% <br />S24. 15 <br />$54.26 <br />S23.13 <br />NA <br />N/A <br />N/A <br />N/A <br />ROAD MAINTENANCE <br />grader , water truck <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />unit subtotals:' $101.55 1 N/A <br />NA <br />NA <br />team subtotals: <br />$101.55 1 <br />NA <br />TOTAL WORK TEAM COB $101.55 <br />► <br />beginning volume: <br />3227 BCY <br />material swell factor: 1.429 <br />cubic yard volume: 3.227 BCY <br />source of volume figure: 4 acre at 6” depth <br />final volume: 4, 610 LCY <br />source of swell factor: SDreadsheet fable _ topsoi <br />,an <br />0 <br />Colorado Division of Minerals and Geolog <br />INTIMATING FORM - SCRAPER W <br />ANTITI <br />DUCT' <br />SCRAPER CYCLE TIME: <br />scraper loading time (min.): 0.9 <br />maneuver & spreading time (min.): <br />0..7 <br />travel time * (haul & return): <br />haul route: <br />road length grade rolling <br />seg. no. (ft.) res. ( %) res. ( %) <br />475 <br />rated payload (Ibs): <br />payload volume (Icy): <br />4.00 <br />7.50 <br />MACHINE PAYLOAD: <br />mat. weight (Ibs/Icy):1 2900.00 <br />mat desc.: Decorncosed rock - 50% Ruck _50% Earth <br />38.400 <br />13.24 <br />JOB CONDITION CORRECTION FACTORS: <br />site altitude (ft.): 6500 <br />attitude adjustment: <br />job efficiency factor: <br />net job correction factor: <br />total <br />res. ( %) <br />11.50 <br />return route: <br />haul time: 1.22 <br />? 475 -4.00 7.50 3.50 2468 0.43 <br />velocity <br />(fpm) <br />569 <br />'1st & last seg. adj. for acceleration/deceleration return time: <br />total cycle time: <br />1.00 <br />0.83 <br />0.83 <br />travel time <br />(minutes) <br />1.22 <br />0.43 <br />3.25 <br />MACHINE VOLUME: <br />struck capacity (Icy): N/A <br />heaped capacity (Icy): <br />average capacity (Icy): <br />adjusted volume (Icy): <br />UNADJUSTED HOURLY PRODUCTION PER SCRAPER OR PUSH -PULL PAIR (LCY /HR): <br />ADJUSTED (job condition corrections) HOURLY UNIT PRODUCTION (LCY /HR): <br />ADJUSTED HOURLY FLEET PRODUCTIONjLCY/hr): <br />16.00 <br />16.00 <br />13.24 <br />244.59 <br />203.01 <br />203.01 <br />13 CO <br />FLEET SIZE: <br />UNIT COST / LCY: <br />scraper(s) 'TOTAL JOB TIME (hours): <br />TOTAL JOB COST: <br />$0.500 <br />22.71 I <br />$2.306 <br />