Laserfiche WebLink
HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Initial <br />Volume: <br />HOURLY PRODUCTION <br />Colorado Division of Minerals and Geology <br />13,713.0 BCY <br />Avg. push distance: 100 ft. <br />JOB COST <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 12 Prep. by: ACS Task File Name: M051 -12 <br />Date: 1,'67'T7 Permit #:M -99 -051 <br />Permit Action: New application <br />Task Description: Replace topsoil on access road <br />Utilization % <br />Ownership cost /hr = $33.69 N/A <br />Operating & overhaul cost /hr- dozer = $37.79 100 <br />- ripper = $0.00 N/A <br />Operator cost /hr = $22.95 N/A <br />Total eqpt. unit cost /hr = $94.43 Total fleet cost /hr: $94.43 <br />Source of quantity take -off: 6" soil over 17 ac. (1.4 mi. x 100') <br />Source of est. swell factor: Spreadsheet table - topsoil <br />Operator 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. : 1.00 (Cat tbl) <br />dozer production: 565 LCY /hr Dozing method 1.00 (gen.) <br />Visibility 1.00 (avg.) <br />Material consistency: Job efficiency.... : 0.83 (lsh /day) <br />Consolidated stockpile Spoil pile factor. : 0.60 (fnd -sf) <br />Push gradient 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 % (pos) Altitude deration. : 1.00 (Cat tbl) <br />Material weight... : 0.79 (user) <br />Avg. site altitude: 6500 ft. Blade type 1.00 (S,SU,U) <br />Material weight 2900.00 lb /LCY Net Job Correction : 0.30 <br />Mat. Descr.: <br />USER - PROVIDED WEIGHT DATA Adjusted Unit Prod.: 167.16 LCY /hr <br />Fleet size : 1 Dozer(s) <br />Mine: Rock School Lease Project <br />Basic Machine: Cat D7H SERIES II Horsepower: <br />Blade Type: SEMI- UNIVERSAL <br />Attachment #1: ROPS Cab Shift Basis: 1 /day <br />Attachment #2: N/A <br />Swell Loose <br />Factor: 1.429 Volume: 19,590.0 LCY <br />Job Condition Correction Factors <br />Adjusted Fleet Production: 167.16 LCY /hr <br />Total Job Time: 117.19 Hours <br />Unit Cost $0.565 /LCY Total Job Cost: $11,066.21 <br />ERR <br />