Laserfiche WebLink
Task #: <br />Date: <br />1 <br />Permit Action: New application <br />Task Description: New application <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />HOURLY PRODUCTION <br />JOB COST <br />Colorado Division of Minerals and Geology <br />Avg. push distance: 210 ft. <br />ESTIMATING FORM - BULLDOZER WORK <br />9 Prep. by: ACS Task File Name: M051 -9 <br />- 7 - 7-S `> <br />6797 Permit #:M -99 -051 <br />Source of quantity take -off: Exhibit L, section L1 <br />Fleet size : 1 Dozer(s) <br />Mine: Rock School Lease Project <br />Basic Machine: Cat D8N Horsepower: <br />Blade Type: UNIVERSAL <br />Attachment #1: ROPS Cab Shift Basis: 1 /day <br />Attachment #2: 1 -shank ripper <br />Utilization % <br />Ownership cost /hr $46.62 N/A <br />Operating & overhaul cost /hr- dozer = $51.93 100 <br />- ripper = $1.58 20 <br />Operator cost /hr = $22.95 N/A <br />Total eqpt. unit cost /hr = $123.07 Total fleet cost /hr: $123.07 <br />Initial Swell Loose <br />Volume: 26,000.0 CCY Factor: 1.125 Volume: 29,250.0 LCY <br />Source of est. swell factor: Spreadsheet table - general fill <br />Job Condition Correction Factors <br />Operator 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. : 0.90 (Cat tbl) <br />dozer production: 515 LCY /hr Dozing method 1.00 (gen.) <br />Visibility 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (lsh /day) <br />Compacted fill or embankment Spoil pile factor. : 0.80 (fnd -rf) <br />Push gradient 0.95 (Cat tbl) <br />Avg. push gradient: 3.00 % (pos) Altitude deration. : 1.00 (Cat tbl) <br />Material weight... : 1.00 (Cat tbl) <br />Avg. site altitude: 6500 ft. Blade type 1.00 (S,SU,U) <br />Material weight 2300.00 lb /LCY Net Job Correction : 0.42 <br />Mat. Descr.: <br />GENERAL FILL Adjusted Unit Prod.: 218.60 LCY /hr <br />Adjusted Fleet Production: 218.60 LCY /hr <br />Total Job Time: 133.80 Hours <br />Unit Cost $0.563 /LCY Total Job Cost: $16,467.57 <br />ERR <br />