My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-12-15_GENERAL DOCUMENTS - M1999051
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1999051
>
1999-12-15_GENERAL DOCUMENTS - M1999051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 7:44:03 AM
Creation date
10/24/2011 1:07:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999051
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
12/15/1999
Doc Name
Memos and Letters
From
DRMS
To
Various
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task #: <br />Date: 12496¢9'7 Permit #:M -99 -051 <br />Task Description: Backfill and grade process /evap. ponds <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Ownership cost /hr <br />Operating & overhaul <br />Operator cost /hr <br />MATERIAL QUANTITIES <br />Initial <br />Volume: <br />HOURLY PRODUCTION <br />Avg. push distance: <br />Unadjusted hourly <br />dozer production: <br />Material consistency: <br />Compacted fill or embankment <br />Avg. push gradient: <br />Avg. site altitude: <br />Material weight <br />Mat. Descr.: <br />GENERAL FILL <br />JOB COST <br />• • <br />8 <br />Colorado Division of Minerals and Geology <br />Permit Action: New application <br />54,000.0 CCY <br />Fleet size : <br />ESTIMATING FORM - BULLDOZER WORK <br />Prep. by: ACS <br />Basic Machine: <br />Blade Type: <br />Attachment #1: <br />Attachment #2: <br />cost /hr- dozer = <br />- ripper = <br />Total eqpt. unit cost /hr = $123.07 Total fleet cost /hr: $123.07 <br />210 ft. <br />6500 ft. <br />Swell <br />Factor: <br />515 LCY /hr <br />3.00 '6 (pos) <br />1 Dozer(s) <br />Task File Name: M051 -8 <br />Mine: Rock School Lease Project <br />Cat D8N <br />UNIVERSAL <br />ROPS Cab <br />1 -shank ripper <br />$46.62 <br />$51.93 <br />$1.58 <br />$22.95 <br />1.125 <br />Source of quantity take -off: Exhibit L, section L -1 <br />Utilization % <br />N/A <br />100 <br />20 <br />N/A <br />Loose <br />Volume: <br />Source of est. swell factor: Spreadsheet table, general fill <br />Job Condition Correction Factors <br />Operator <br />Mat. consistency.. <br />Dozing method <br />Visibility <br />Job efficiency.... <br />Spoil pile factor. <br />Push gradient <br />Altitude deration. <br />Material weight... <br />Blade type <br />2300.00 lb /LCY Net Job Correction : <br />Adjusted Unit Prod.: <br />Adjusted Fleet Production: <br />Total Job Time: <br />Horsepower: <br />Shift Basis: 1 /day <br />60,750.0 LCY <br />0.75 (avg.) <br />0.90 (Cat tbl) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lsh /day) <br />0.80 (fnd -rf) <br />0.95 (Cat tbl) <br />1.00 (Cat tbl) <br />1.00 (Cat tbl) <br />1.00 (S,SU,U) <br />0.42 <br />218.60 LCY /hr <br />218.60 LCY /hr <br />277.90 Hours <br />Unit Cost $0.563 /LCY Total Job Cost: $34,201.89 <br />ERR <br />
The URL can be used to link to this page
Your browser does not support the video tag.