Laserfiche WebLink
• • <br />Colorado Division of Minerals and Geology <br />Task #: 10 Prep. by ACS Task File Name: M051 -10 <br />Date: 4.249.6747 Permit #:M -99 -051 Mine: Rock School Lease Project <br />Permit Action: New application. <br />Task Description: Grade process plant site <br />HOURLY EQUIPMENT COST <br />Cost Breakdown: <br />Utilization % <br />Ownership cost /hr = $46.62 N/A <br />Operating & overhaul cost /hr- dozer = $51.93 100 <br />- ripper = $1.58 20 <br />Operator cost /hr = $22.95 N/A <br />MATERIAL QUANTITIES <br />Initial <br />Volume: <br />JOB COST <br />Total eqpt. unit cost /hr = $123.07 Total fleet cost /hr: $123.07 <br />26,000.0 CCY <br />Source of quantity take -off: Exhibit L, section L -1 <br />ESTIMATING FORM - BULLDOZER WORK <br />Basic Machine: Cat D8N Horsepower: ERR <br />Blade Type: UNIVERSAL • <br />Attachment #1: ROPS Cab Shift Basis: 1 /day <br />Attachment #2: 1 -shank ripper <br />Source of est. swell factor: Spreadsheet swell table - general fill <br />HOURLY PRODUCTION <br />Avg. push distance: <br />180 ft. <br />Swell <br />Factor: <br />Fleet size : 1 Dozer(s) <br />1.125 <br />Loose <br />Volume: <br />29,250.0 LCY <br />Job Condition Correction Factors <br />Operator 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. : . 0.90 (Cat tbl) <br />dozer production: 606 LCY /hr Dozing method 1.00 (gen.) <br />Visibility 1.00 (avg.) <br />Material consistency: Job efficiency.... : 0.83 (lsh /day) <br />Compacted fill or embankment Spoil pile factor. : 0.70 (fnd -mf) <br />Push gradient 0.95 (Cat tbl) <br />Avg. push gradient: 3.00 % (pos) Altitude deration. : 1.00 (Cat tbl) <br />Material weight... : 1.00 (Cat tbl) <br />Avg. site altitude: 6500 ft. Blade type 1.00 (S,SU,U) <br />Material weight 2300.00 lb /LCY Net Job Correction : 0.37 <br />Mat. Descr.: <br />GENERAL FILL Adjusted Unit Prod.: 225.45 LCY /hr <br />Adjusted Fleet Production: 225.45 LCY /hr <br />Total Job Time: 129.74 Hours <br />Unit Cost $0.546 /LCY Total Job Cost: $15,967.53 <br />