Laserfiche WebLink
ame0 <br />D) Geomembrane Acceptance <br />1) VLF <br />Primary 80mi1 geomembrane (P874, P879 and P1034-P1103) shown on Figure 4 was inspected <br />by AMEC and Lonestar representatives and found to be installed within project specifications <br />and acceptable for continued construction activities. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and assisted in the placement of SLF material within the Phase 5 VLF. <br />AMEC inspected and approved subgrade prior to geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed the excavation and backfill of anchor trenches within the Phase 5 VLF. <br />AMEC inspected and approved 80mil primary geomembrane within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />AMEC observed leak detection system construction within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue subgrade acceptance prior to SLF placement within the Phase 5 VLF. <br />Continue slope contouring and subgrade preparation within the Phase 5 VLF. <br />Continue SLF placement within the Phase 5 VLF <br />Continue subgrade acceptance prior to geomembrane deployment within Phase 5 VLF. <br />Continue geomembrane installation within Phase 5 VLF. <br />Continue obtaining samples and assisting in the process of DCF material at the DCF Process area. <br />Continue excavation and backfill of the existing (temporary) anchor trench within the Phase 5 VLF. <br />VLF Weekly Report WE 10.01.2011 <br />