Laserfiche WebLink
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />89,452 <br />444,873 <br />Total <br />89,452 <br />444,873 <br />ame <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a CAT dozer. <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF resumed performing deployment, seaming, <br />and repair /QC activities. Geomembrane installation was performed in the area shown on <br />Figure 3. Approximately 179,241 square feet of 80mil LLDPE was deployed using a Komatsu <br />200 excavator and a John Deere 544 front -end loader with spreader -bar attachments. Subgrade <br />was inspected and approved by AMEC and Lonestar representatives prior to geomembrane <br />deployment (see Figure 3). Approximately 9,518 linear feet of seam was fusion welded using <br />three fusion welding machine /welding technician combinations. Twenty destructive test <br />samples were marked during fusion seaming. Approximately 513 linear feet of seam was <br />extrusion welded using three extrusion welding machine /welding technician combinations. <br />Four destructive test samples were marked during extrusion seaming. All destructive tests <br />performed were within project specifications. Non - destructive testing was performed for fusion <br />welded seams. Repairs were performed using the extrusion welding method for all marked <br />defects. Vacuum testing was performed for all extrusion welded seams and repairs. <br />During the Cresson blasts, an AMEC field representative observed the geomembrane and no <br />damage was noted. <br />B) Geomembrane Exposure <br />1) VLF <br />No work performed during the week. <br />C) Anchor Trench <br />1) VLF <br />Anchor trench excavation continued between stations A23 +00 ( + / -) and A26 +00 ( + / -), <br />approximately 400 feet left of centerline using a John Deere 35D excavator and one laborer. <br />The anchor trench was inspected by an AMEC field representative and found to be constructed <br />in accordance with design drawings and project specifications. <br />Anchor trench backfill was performed between stations J21 +00 ( + / -) and J25 +00 ( + / -), near <br />centerline using a John Deere 35D excavator, a vibratory plate compactor and laborers. An <br />AMEC field representative observed the backfill and it was found to be constructed in <br />accordance with design drawings and project specifications. <br />VLF Weekly Report WE 10.01.2011 <br />