Laserfiche WebLink
Continue geomembrane exposure within the Phase 5 VLF. <br />Continue installation of the high volume solution collection system within the Phase 5 VLF. <br />Continue DCF placement within the Phase 5 VLF. <br />Continue leak detection system installation within the Phase 5 VLF. <br />Continue 80mil primary geomembrane acceptance within the Phase 5 VLF. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V :: <br />CC &V held a weekly construction meeting on September 27, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />Jay Moore (Project Certifying Engineer), Kim Morrison (Project Sponsor) and John Weingardt (Senior <br />Engineer) was onsite to observe site activities, progress, and scheduling. <br />Summary of Incidents/Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represent -ur findings and observations for the week ending <br />October 1, 2011. <br />Joseph Hickey, CQA Moni. <br />Approved By: <br />Date: October 1, 2011 <br />ate: 9t7 <br />0 <br />VLF Weekly Report WE 10.01.2011 <br />