3.07 EQUIPMENT: <br />Section 02200 <br />Earthworks <br />* ** END OF SECTION * ** <br />S:\Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \02200.r0.doc <br />ameP <br />take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC &V. <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br />until the surface is covered. CONTRACTOR shall repair all weather related damage to <br />Bedding Fill surfaces or other portions of the Work that have or have not been covered by <br />geomembrane, at no additional cost to CC &V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final seaming <br />and softens the Bedding Fill, the geomembrane shall be removed and CONTRACTOR <br />shall recondition and recompact the Soil Liner Fill to meet all placement and trimming <br />SPECIFICATIONS, at no additional cost to CC &V. <br />7. CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and backfill <br />all holes with MANAGER and CERTIFYING ENGINEER approved material. <br />8. CONTRACTOR shall verify the final thickness of Bedding Fill to determine compliance <br />with this SPECIFICATION. CONTRACTOR shall record as part of the as-built <br />documentation the location, elevation, and thickness of each Bedding Fill verification test. <br />CQA Monitor will witness all verification measurements. Areas with deficiencies shall be <br />reworked by CONTRACTOR, until acceptable measurements are obtained at no <br />additional cost to CC &V. If tests indicate the Work does not meet the requirements of the <br />SPECIFICATIONS, MANAGER and CERTIFYING ENGINEER will establish the <br />extent of the nonconforming area. The nonconforming area shall be reworked by <br />CONTRACTOR until acceptable test results are obtained at no additional cost to CC &V <br />9. Prior to any geosynthetics being placed on Bedding Fill, the area will be tested by CQA <br />Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined in <br />Section 3.06, without the area in question being retested by the CQA Monitor. <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules and <br />regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />Page 18 of 18 January 14, 2011 <br />Revision 0 <br />