Laserfiche WebLink
Section 02200 <br />Earthworks <br />I. Pipe Bedding Material <br />ame <br />1. Pipe Bedding material shall be placed around the CSP as shown on the drawings. <br />2. For piping external to the valley leach facility, CONTRACTOR shall compact the Pipe <br />Bedding Material requiring compaction to at least 95 percent of the maximum dry density <br />as determined by the Standard Proctor density test (ASTM D698), and a moisture content <br />3 percent below and 3 percent over the optimum moisture content. <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12 -inch loose lifts. Pipe <br />Bedding Material will be worked under pipe haunches by hand to provide uniform support <br />of the CSP. <br />4. Native material used for backfilling CSP excavation shall be placed in 12 -inch to 18 -inch <br />loose lifts, and compacted by wheel rolling with light, rubber tired or other light compaction <br />equipment, as approved by CERTIFYING ENGINEER. <br />J. Granular Filter Material <br />I. Granular Filter Material shall be placed beneath the Riprap as shown on the drawings. <br />K. Bedding Fill <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12- inches. CONTRACTOR shall condition the <br />Bedding Fill to allow a surface that does not cause rutting or other deleterious effects. The <br />moisture content and density shall be uniform throughout the lift. If a lift of compacted <br />Bedding Fill dries out during placement operations, CONTRACTOR shall scarify, <br />moisture condition the dry soil and recompact the lift. If a lift of compacted Bedding Fill <br />becomes overly wet due to precipitation or over watering, CONTRACTOR shall allow the <br />wet soil to dry to the specified moisture content range before recompaction of fill and <br />placement of geosynthetic materials. <br />3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown on <br />the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0.5 inches in height. CERTIFYING <br />ENGINEER shall determine if surface preparation is sufficient to place geomembrane. On <br />areas with slopes steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary <br />to obtain the same final surface preparations that would be obtained by the passage of a <br />smooth -drum roller on flat or level ground. Pushing of compaction equipment by tracked <br />equipment shall not be performed. Wheel ruts on the surface of the Bedding Fill from <br />grading equipment shall be repaired by CONTRACTOR prior to placement of the <br />geomembrane by rolling the surface as approved by CQA Monitor. CONTRACTOR shall <br />S: \Projects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs\02200.r0.doc <br />Page 17 of 18 January 14, 2011 <br />Revision 0 <br />