Laserfiche WebLink
C- 2010 -088 Fruita Loadout <br />4 th Preliminary Adequacy Review (MLT) <br />24- Aug -2011 <br />Page 4 of 6 <br />118. Item resolved. <br />Miscellaneous Corrections <br />43. Item resolved with CAM's April 2011 response. <br />44. Item resolved with CAM's April 2011 response. <br />45. Item resolved with CAM's April 2011 response. <br />2.05.3(4) Ponds and Impoundments <br />60a. Item resolved with CAM's July 2011 response. <br />2.05.3(5) Topsoil <br />63a. Item resolved with CAM's July 2011 response. <br />2.05.3(6) Overburden <br />Construction Material .Borrow Area <br />63b. Item resolved with CAM's July 2011 response. <br />63c. Item resolved with CAM's July 2011 response. <br />2.05.4 Reclamation Plan <br />65a. Item resolved with CAM's July 2011 response. <br />2.06.6 Special Categories of Mining <br />99a. Item resolved with CAM's July 2011 response. <br />2.10 Maps and Plans - Text <br />116a. Item resolved with CAM's July 2011 response. <br />Maps 10, 11 and 12 Pre- and Post - Mining Topogrgphy and Cross Sections <br />116b. Item resolved with CAM's July 2011 response. <br />116c. Item resolved with CAM's July 2011 response. <br />116d. Item resolved with CAM's July 2011 response. <br />Map 13 Drainage Plan Ponds 1, 2 and 3 <br />116e. Item resolved with CAM's July 2011 response. <br />116f. Item resolved with CAM's July 2011 response. <br />116g. The horizontal and vertical scales for Sections A A , B -B' and C -C are consistent. <br />Item resolved. <br />