My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-23_REPORT - M1977129
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977129
>
2011-09-23_REPORT - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:33 PM
Creation date
9/27/2011 9:55:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
REPORT
Doc Date
9/23/2011
From
Whitewater Building Materials Corporation
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee: <br />Permit #: M- 1977 -129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09/221011 <br />Plant Site (tan). We will continue to removed stockpiled <br />material from Stage W as needed. <br />Please refer to Map 2 of 2 when reviewing the following <br />information. Mining was completed on the 8.8 acres <br />partially mined last year (orange). No new stripping was <br />done this year as we have 14.30 acres in Stage 3 - PART B <br />partially mine or stripped ready for mining (yellow). <br />Topsoil along the north side of the excavated area remains <br />undisturbed. This berm serves two purposes, as a topsoil <br />pile and an MSHA safety berm. The 6.00 acre raw material <br />storage area in the northwest part of Stage 6 is still <br />being used. The main processing plant is located on the <br />Industrial Site at 1360 Coffman Road. The overburden <br />stockpiled area east of the stripped area is still in use <br />(brown). This material will be used to reclaim the slopes <br />and resoil the above water areas as reclamation progresses <br />in this stage. <br />(2) See Sheet 1 of 2. The west arm of Stage 2 - PART A (2.79 <br />ac.) was seeded in the fall of 2010 and begins the second <br />year. Reclamation is complete on the Cattle Feeding Areas <br />in Phases A thru F (purple). Revegetation is complete on <br />the south slopes of Phases A thru C. A 900 -foot section of <br />perimeter road was constructed for the landowners on the <br />north side of the west arm. The two landowner building <br />sites remain unchanged from last year (brown). The above <br />water areas in Stage 2 - PART A and around the backfill area <br />were seeded in November 2009 after the water level <br />stabilized (green). The new landowners of this area began <br />to use the lake for water skiing this summer and have <br />constructed a sandy volleyball area on the SW Building <br />Site. The wave action from the boats have created a 1 -2 <br />foot vertical bank and a 2 foot band along the normal lake <br />level that does not support vegetation. <br />The seeding around Stage 2 - PART B is growing and will <br />complete it's 3 growing seasons in November 2011. The <br />landowner of this area installed 2 water inlets on the <br />southern part of the lake and diverts irrigation water he <br />owns from East Creek into this lake. An outlet pipe was <br />installed in the NE corner to regulate the amount of water <br />he place in the lake. As a result the lake level <br />WHITI <br />
The URL can be used to link to this page
Your browser does not support the video tag.