My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-08-26_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:16 PM
Creation date
9/27/2011 9:55:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
8/26/2011
Doc Name
Fifth adequacy letter (CN-01)
From
DRMS
To
R Squared Incorporated
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />To: Wally Erickson <br />From: Tim Cazier, P.E. <br />Date: August 22, 2011 <br />Mined Land Reclamation <br />MEMORANDUM <br />STATE OF COLORADO <br />Re: May Day & Idaho Mine Complex Permit No. M- 1981 - 185 /CN -01, Comments <br />to Selected Work Plans from the August 2011 Submittal, Exhibit D <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />The Division of Reclamation, Mining and Safety (DRMS) engineering staff has reviewed the <br />following selected work plans in Exhibit D of the August 2011 submittal: <br />a) Attachment D -2, Portal Collapse Repair Work Plan May Day No. 1, <br />b) Attachment D -3, Little Deadwood Gulch May Day No. 2 Drainage Control, <br />c) Attachment D -4, Chief Drainage and Portal Work Plan and Lamb Affected Area Little <br />Deadwood Gulch, <br />d) Attachment D -6, Augmentation Pond Work Plan. <br />The following comments are posed to ensure adequate engineering analyses and design practices <br />are implemented in accordance with Rules 6.3.3(1), 6.4.21(7) & (10), and 7.3.1(3). <br />Attachment D -2, Portal Collapse Repair Work Plan May Day No. 1 <br />1. Page 4, second to last paragraph, the applicant states Wildcat will obtain approval from <br />DRMS prior to commencing portal repair activities. The applicant should be aware that <br />DRMS approval can only be obtained through the Technical Revision process. The <br />submittal will require the following: <br />a. The technical memorandum summarizing the information, data, and design <br />resulting from the work plan outlined in the bulleted list above the referenced <br />paragraph on page 4. <br />b. There is no discussion in Attachment D -2 related to portal repair drawings and <br />specifications. The applicant needs to commit to providing DRMS with repair <br />drawings and specifications. <br />2. Page 8, Reporting. The second paragraph indicates "as- built" drawings will be prepared <br />in the third quarter of 2011. DRMS recommends this statement be revised such that the <br />Office of Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.