My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to August 19, 2011 Cazier Memorandum <br />September 9, 2011 <br />Page 5 <br />DEN 97,591,785v2 9 -9 -11 <br />stabilize the bridge, Wildcat will implement a geotechnical work plan <br />consisting of performing a review of existing data, subsurface investigation, <br />laboratory testing, engineering analysis, conclusions regarding site stability, <br />and design criteria recommendations. Specifically, Wildcat will perform the <br />following: <br />o Drill two test borings to 20 feet or refusal at the abutments of the <br />bridge. Our engineer /geologist will log the borings and obtain <br />relatively undisturbed, bulk samples of the materials encountered. <br />Samples will be inspected to confirm field classifications and for <br />laboratory testing; <br />o Selected samples will be transported for laboratory testing <br />including moisture content, dry density, strength, classification, <br />grain -size distribution, and compaction tests; <br />o Perform engineering and geologic evaluations to develop <br />conclusions and recommendations regarding the following: <br />• Stability of bridge and abutments; <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />• Design for bridge improvements, as necessary, <br />accommodate load bearing necessary for proposed mining <br />operations. <br />o Prepare a technical memorandum summarizing the results of the <br />work described above. <br />o Submit design for bridge improvements to DRMS, as necessary, <br />pursuant to the Technical Revision or Amendment process. <br />o After obtaining DRMS approval through the Technical Revision <br />or Amendment process, proceed with remainder of work plan. <br />Wildcat is including a new Attachment 6.5.6 as Attachment 6 to this response. <br />Adequacy Issue No. 8. <br />Page 10, Blasting Impacts. The first sentence references Attachment 6.5.5 for the <br />blasting analysis. The blasting analysis is in Attachment 6.5.4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.