My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to August 19, 2011 Cazier Memorandum <br />September 9, 2011 <br />Page 3 <br />Finally, Wildcat will add the following bullets to the list of bullets at Page 4 of <br />Attachment D -2: <br />• Submit revised design plans for portal stabilization, including repair drawings <br />and specifications, as necessary, through the Technical Revision or <br />Amendment process; <br />• After obtaining DRMS approval through the Technical Revision or <br />Amendment process, proceed with remainder of work plan. <br />Adequacy Issue No. 3. <br />Page 4 fourth paragraph, the applicant references Figure 6.5 -2 for the Incas Road and <br />Chief Portal geotechnical drill program. The Incas Road is labeled on Figure 6.5 -2, but <br />not the Chief Portal. The Chief Portal should be labeled on the figure for future <br />reference and location. <br />Response to Adequacy Issue No. 3. <br />Wildcat will label the Chief Portal on Figure 6.5 -2. <br />Adequacy Issue No. 4. <br />Page 4, New Access Road. The second bullet references "New Access Road Stability <br />Report (Attachment 6.5 -3 and Attachment 6.5 -4) ". Attachment 6.5 -3 is the <br />"Geotechnical reconnaissance report" referenced in the first bullet and Attachment 6.5 -4 <br />is the "Analysis of the Effect of Blasting Operations on Structures Associated with <br />Mining Activity at the May Day Mine. The "New Access Road Stability Report" is not <br />to be found. <br />Response to Adequacy Issue No. 4. <br />The "New Access Road Stability Report" was inadvertently left out of the <br />revised August 9, 2011 mine permit application; however the report was included in <br />previous submittals. Please find the requested report in Attachment 5. <br />Adequacy Issue No. 5. <br />Page 6, Embankments. The reader is directed to Attachment D -5 for the Augmentation <br />Pond embankment discussion. Attachment D -5 is the Dry Stack Tailings Work Plan. <br />The Augmentation Pond work plan is presented in Attachment D -6. <br />Response to Adequacy Issue No. 5. <br />Wildcat will correct this reference to Attachment D -6. <br />DEN 97, 591, 785v2 9 -9 -11 <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.