My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to August 19, 2011 Cazier Memorandum <br />September 9, 2011 <br />Page 2 <br />Attachment 3. Based on existing information, approximately 21 steel sets will be <br />required to stabilize the portal and processing equipment. <br />Adequacy Issue No. 2. <br />Page 3 second paragraph, the applicant references Attachment D -3 for rock mechanics <br />portal repair recommendations for the May Day No. 1 Portal. Attachment D -3 is for <br />Little Deadwood Gulch May Day No. 2 drainage repair. DRMS could find no <br />discussion related to rock mechanics portal repair recommendations. <br />Response to Adequacy Issue No. 2. <br />Wildcat will correct the identified reference at Page 3, second paragraph, which <br />should have cited to Attachment D -2 (Portal Collapse Repair Work Plan). Wildcat <br />discusses rock mechanics portal repair recommendations at Page 4 of Attachment D -2. <br />Wildcat has confirmed the rock mechanics aspects of this work plan with an outside rock <br />mechanics consultant from whom it has received a proposal, Agapito Associates, Inc., <br />located in Golden, Colorado. <br />Wildcat will clarify its proposed engineering analysis by modifying the second <br />paragraph on Page 4 of Attachment D -2, as follows: "To confirm the approach described <br />above, Wildcat will implement a geotechnical and rock mechanics work plan <br />consisting of ...." <br />Wildcat will also add a third bullet to the list of bullets at Page 4 of Attachment <br />D -2, as follows: <br />• As necessary based upon preliminary rock mechanics field observations, <br />obtain appropriate rock sample to perform laboratory analysis of rock <br />mechanical properties; <br />Wildcat will also modify the existing third bullet to the list of bullets at Page 4 of <br />Attachment D -2, as follows: <br />• Selected samples will be transported for laboratory testing including testing <br />for rock mechanical properties, moisture content, dry density, strength, <br />classification, grain -size distribution, and compaction tests; <br />Wildcat will also modify the fifth sub - bullet under the existing fourth bullet in <br />the list of bullets at Page 4 of Attachment D -2, as follows: <br />• Design criteria for steel set foundations (See Figure D -2), including allowable <br />bearing capacity and ground improvement approaches as necessary, rock <br />bolting, or other remedial support strategies <br />DEN 97, 591, 785v2 9 -9 -11 <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.