My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-09_REVISION - M1981185 (43)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-09-09_REVISION - M1981185 (43)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:17 PM
Creation date
9/12/2011 12:15:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
9/9/2011
Doc Name
Response to Fifth Adequacy Letter
From
R Squared, Inc.
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wallace H. Erickson <br />Response to Fifth Adequacy <br />September 9, 2011 <br />Page 15 <br />DEN 97,599,531v1 9 -9 -11 <br />• Wildcat will implement the following work plan to develop design <br />specifications, to construct and to obtain licensed professional engineer <br />certification of the Filter Press Building as an Environmental Protection <br />Facility: <br />• Following completion of Portal Collapse Repair Work Plan, <br />Attachment D -2, prepare design for Filter Press Building, including <br />appropriate sub -grade preparation, concrete foundation design and <br />stem wall design; <br />• Submit revised design plans for the Filter Press Building through the <br />Technical Revision or Amendment process; <br />• After obtaining DRMS approval through the Technical Revision or <br />Amendment process, proceed with remainder of work plan, perform <br />scope of work to construct Filter Press Building. <br />• Inspect concrete floor, stem wall and roof in mill building for cracks <br />or leaks; <br />• Perform engineering evaluation to develop conclusions and <br />recommendations regarding: <br />o Design criteria for sealing cracks or leaks in concrete floor, stem <br />wall and roof of mill building. <br />• Prepare a technical memorandum summarizing the results of the work <br />described above; <br />• Submit revised design plans for the Filter Press Building to address <br />sealing of leaks or cracks in concrete floor, stem wall and roof, as <br />necessary, through the Technical Revision or Amendment process; <br />and, <br />• After obtaining DRMS approval through the Technical Revision or <br />Amendment process, proceed with remainder of work plan, perform <br />scope of work to seal leaks or cracks in concrete floor, stem wall and <br />roof, and obtain licensed professional engineer certification of Filter <br />Press Building as Environmental Protection Facility. <br />o Wildcat will also modify the Expected Concentrations, Process Solution <br />Volumes and Fate section at Page 6 of Exhibit U, by adding the following <br />language to the end of the paragraph: <br />GREENBERG TRAURIG, LLP • ATTORNEYS AT LAW • WWW.GTLAW.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.