My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-30_REVISION - M1977215 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977215
>
2011-08-30_REVISION - M1977215 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:47 PM
Creation date
9/9/2011 7:46:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
REVISION
Doc Date
8/30/2011
Doc Name
Tailings Pond 2 Evaporation Pond Technical Specifications
From
Rio Grande Silver
To
DRMS
Type & Sequence
TR17
Email Name
RCO
SSS
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 - GENERAL <br />1.1 SECTION INCLUDES <br />SECTION 01450 <br />QUALITY ASSURANCE /QUALITY CONTROL <br />A. This section covers quality control (QC) and quality assurance (QA) <br />requirements. <br />1.2 RELATED SECTIONS <br />A. Section 01330: Submittals. <br />B. Section 02320: Earthwork. <br />C. Section 02610: HDPE Pipe and Fittings <br />D. Section 02620: Geosynthetic Liner <br />1.3 SUBMITTALS <br />A. Submit in accordance with Section 01330: Submittals. <br />1.4 DEFINITIONS <br />J <br />A. QA: Independent testing and construction observation to confirm that in- <br />place materials and finished products comply with the Specifications, and <br />finished products meet the intent of design and that construction <br />procedures meet or exceed the intent of the Specifications and were not <br />altered in a manner to potentially adversely impact the integrity or <br />performance of the finished products. <br />B. QC: Sampling, testing, and measuring by the Contractor to check that all <br />materials used for the Work comply with the Specifications, and that the <br />work and finished products comply with the Design Drawings and <br />Technical Specifications. <br />C. RIO GRANDE SILVER: Rio Grande Silver refers specifically to the owner <br />of the Project. <br />D. PROJECT MANAGER: The Project Manager refers specifically to the <br />individual appointed by Rio Grande Silver. The Project Manager is the <br />official representative of Rio Grande Silver responsible for all construction <br />activities including oversight and direction during construction. The <br />Project Manager is also responsible for coordinating QA activities for the <br />project. <br />The Project Manager shall serve as communications coordinator for the <br />project initiating preconstruction and resolution meetings. As <br />Rio Grande Silver Tailings Evaporation Pond 01450 -1 Quality Assurance /Quality Control <br />August2011 01450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.